Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Reliability Testing on OEM Systems

by Arthur Hart 1 Comment

Reliability Testing on OEM Systems

Reliability Testing on OEM Systems

Introduction — OEM Systems with Limited Samples

I was assigned to a new project at HP as a reliability engineer was to develop a rear projection, large screen TV.   As the project was being defined, I was informed that an Asian Original Equipment Manufacturer (OEM) would be developing and manufacturing the HW while HP developed the SW.  HP would own the service center support of field issues.  My role was to represent the customer and evaluate the reliability of the final product.

As I got into the project, I was surprised to find out that the OEM would not share any of their internal data on the HW and any history of similar systems they produced.  HP would be provided 30 prototype TV units to evaluate SW performance.  The reliability evaluation phase would get one (1) unit for testing.  This is a good example of the limitations placed on reliability studies for large, OEM systems where test samples are severely limited.

The approach I took was to:

  1. Define the functions in the project using the Functional Architecture (ref. REI book – page 23) and their linkages. Gain consensus between HP and the OEM.
  2. Establish reliability goals for the project based on known competitor experiences and specified field repair costs. Share results with service and marketing groups.   Gain agreement within SW team to allow SW upgrades in the field using zip drives.
  3. Testing the units available using two approaches (this will be discussed below):
    1. Use HALT testing on the one reliability unit by testing to failure (ref. REI book, pages 28-30)
    2. Use the other Proto units for Home evaluation.

HALT Testing of Large System

Since I did not have access to a chamber large enough to handle a large screen TV (for thermal cycling) and the vibration table was located in the shipping area, I took the strategy of making the TV itself a thermal chamber (putting a heater into the air intake vent of the TV with temperature sensors to monitor the internal levels).  The TV (with heater) was placed on top of the vibration table allowing me to operate the TV while performing vibration and thermal cycling stresses simultaneously. Cameras were placed inside the TV to capture any changes real time.

Varying operation settings helped to maximize electrical operation coverage. Thermal cycling and vibration started at low levels and increased until a failure occurred.   When a failure occurred, the problem area was repaired, and stresses continued to increase.  This allowed us to find all marginal areas on the one unit.

Failures found were loose cables, flexing PCBs, and marginal components.  These results were fed back to the OEM.   Fixes were implemented making the TV design more robust to shipping and long-term operation. 

Using Customer Simulation Before Product Release

Each project team member at HP (including the reliability engineer) was asked to take home one of the TVs during development and use it like they would their own.  The entire family was encouraged to be part of this test.   Feedback sheets were brought back to HP weekly.

The result was a combination of known issues (those the team was working on) and many unexpected issues that were added to the project deliverables.  Issues found were:

  • HW issues: failures of power supplies due to lack of ventilation, projection lamp early failure, remote control button failure and screen image irregularities.
  • SW issues: compatibility between HW and SW, incorrect sequencing, and limited performance capability.
  • Other issues:
    • Documentation: setting-up TV, and selecting options
    • Procedures: updating of SW,
    • Expectations: This was the most enlightening to the project team.  The family members used the TV in unexpected ways and gave their inputs openly to the team members.  Some of the surprising expectations were.
      • Slow time for turning on TV,
      • Buttons on remote control were sluggish and not intuitive,
      • Viewing angle limited so whole family could not see screen,
      • Placement of TV on tables was sometimes unstable.

The use of the HALT and Home TV testing approaches helped to solve many issues before becoming customer experiences; thus, improving the overall TV performance.

Filed Under: Articles, on Product Reliability, Reliability Engineering Insights

About Arthur Hart

Mr. Hart worked for Navy Microelectronic labs in failure analysis, MRC consulting modeling of radiation effects on satellites, and over the last 34 years, at Hewlett-Packard on product development reliability.   At HP, reliability studies were on products including integrated circuits, calculators, inkjet printers, projectors, and TVs.

« The 7 Myths of Transformer Reliability
Are You Planning Ahead? »

Comments

  1. Eli Richardson says

    June 24, 2022 at 7:32 AM

    I found it interesting when you explained how testing your products and using customer simulation techniques could help you. In my opinion, it’d be wise if you test your product before putting it on the market, so I think it’d definitely be a must for a business owner. Thanks for the insight on how to detect issues before selling your product.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Arthur Hart
in the Reliability Engineering Insights series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy