Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / How Well should a Maintenance Job be Planned?

by Mike Sondalini Leave a Comment

How Well should a Maintenance Job be Planned?

How Well should a Maintenance Job be Planned?

 How well should a maintenance job be planned ? All maintenance work needs a plan that lets the maintainer do the work correctly, safely, in the least possible time and for the least cost. Selecting the information and details that go into the maintenance job plan is vital to its success. Leave out necessary specifics and facts and you put the job at increased risk of failure, loss and waste. Exactly what details are necessary to allow maintenance work to flow wonderfully well at minimal cost and time are important for a maintenance planner and their managers to know. 

Do not plan a maintenance job well and watch how quickly it turns into trouble and stress for all concerned. Maintenance work needs fully detailed planning: 

1. to ensure the job goes right and is trouble-free from start to finish, 

2. to ensure it is done without error, 

3. so the equipment is returned to design conditions and operation 

4. to minimise the cost of the job, 

5. to permit good coordination between parties involved in or affected by the work, 

6. to do the job safely, and 

7. to do the job in minimal time. 

This list gives us a way to measure how well a maintenance job is planned, prepared and performed. 

Maintenance planning is not the same as maintenance scheduling; they are totally different. Using an overseas trip analogy: planning is what you put in the suitcase for the trip, scheduling is buying the ticket. You need to be well prepared for the events that will happen at the destination, and you also need to get to the destination. Both planning and scheduling need to be done well. 

Only planning can make a maintenance job successful, scheduling has no impact on how well the job is eventually done. In fact, poor scheduling will ruin a well-planned maintenance job and great scheduling cannot save poorly planned work. Scheduling is the timetabling and coordination of resources and can only be done well after there is a plan to be completed. What is not planned cannot be scheduled. If anything is left off the plan the scheduling and coordination cannot correct the error. When the plan is poor or wrong the job result will always be poor and wrong. Hence correct and thorough planning is the foundation of maintenance job success, and it is worth spending a great deal of effort in getting the work plan and the preparation right. 

All maintenance planners produce a product—the work pack or job pack. The job pack contains every detail and piece of information needed to do the work correctly, effectively and efficiently. Good maintenance planning starts with a list of the things and issues that will be addressed in the job pack. The planner then follows that list of standardised requirements and delivers them fully in the job pack. An example of a list of the minimum requirements for a job pack is shown in Table 1. 

A vital part of the job pack is the job plan for doing the work. The job plan is what the scheduler and maintainer follow when they do their work. The job plan is the line-of-sight steps that are followed to complete the work correctly. The job plan is not the job procedure. A job procedure details every task’s entire range of activities (one task may have several activities to do to complete the task), directs all the actions to be done during the work by the maintainers, includes the task standards that they must be done to produce top quality results, and is a full record of the job showing the condition the equipment was found in and the condition it was left in. The job procedure is written once there is a job plan available. With the job procedure the maintenance planner influences and guides their plant and equipments’ reliability and operational performance by the quality and detail of the information and advice they put in the job procedure. You can see a thoroughly detailed job procedure at ACE 3T Job Procedure Plummer Block Example.

MAINTENANCE WORK PACK MINIMUM CONTENT

ITEM No DESCRIPTION COMMENTS 
1 Job Plan The workflow process diagram of job milestones in line-of-sight detail. 
2 Skills / Competencies required The expertise and competencies needed to do the job correctly 
3 Job Procedure Task by task fully detailed description with quality standards and corrective action. 
4 All Drawings relevant to the job Could be mechanical, electrical, civil, structural, process diagrams, etc. 
5 Bill of Materials for the job The parts used in the job including part number, part description and quantity required 
6 Tools List for the job The tools needed to do the job safely and correctly 
7 Equipment List for the job Include the equipment specification e.g. Franna Crane 20T, Mobile Air Compressor 150 CFM, two-man elevated work platform, etc. 
8 Settings / Set Points For calibration and adjustment. 
9 Inspection and Test Plan with Quality Standards Pass/Fail criteria for each task. Includes providing tolerances and condition criteria to confirm a part can remain in-service or is to be replaced. 
10 Data Sheets of the equipment Information on the design and service specifications. 
11 Record Sheets A place to make a record of an observation or measurement as proof. Often satisfied with an Inspection and Test Plan. 
12 Calculation Sheets A place to do the calculation laid-out in the sequence of the calculation with space for the figures and an example of a correct calculation. 
13 All Permits and Tags Safety, environmental, disposal, transport heritage, plant handover, etc approvals 
14 Risk Assessment Forms Site risk assessment and management documents. 
15 All Technical Tables Copies of manufacturer data tables or international engineering tables highlighted to show the information applying to the job. 
16 Special Requirements Instructions and particulars specific to the job that must be observed. 
17 Commissioning Plan Controlled testing to confirm proper operation. 
18 Parts and Materials All parts and materials are identified and gathered together in one location 
19 Proof Test Recording Sheet A check sheet to note the proof test results for each job plan activity that confirms work quality is achieved 
20 Failure Mode and Equipment Health Report A record of the Technicians observations and decisions and photographic 
Table 1 The Contents of a Maintenance Job Pack 

Developing the Line-of-Sight Job Plan 

The second duty for a maintenance work planner is to develop the work plan in a tabular format showing the line-of-sight tasks (the first duty is to go to the job site and scope the work). Line-of-sight means that as each task is done the next task to be undertaken is clearly obvious and requires no need to imagine what it will be. Line-of-sight is an ideal way to show what needs to be done to do a job well, while making it clear exactly how the job will run to reach its successful conclusion. 

Figure 1 shows a centrifugal pump set and the assembly drawing of a pump. We will use it in an example of how to develop a job plan to replace the bearings in the housing because a condition monitoring inspection found them running noisily and rapidly approaching failure.

Figure 1 Centrifugal Pump Set and Pump Cross Section
Figure 1 Centrifugal Pump Set and Pump Cross Section 

In a well organised and managed maintenance planning system there will be a standardised template covering the work plan for this job. When a centrifugal pump needs maintenance the template is accessed, adjusted for the specifics of the job and completed. For this example we will develop the job plan and you can use it as a template in your operation if you wish. 

Task NoTask NameDetailed Task DescriptionDone ByAdditional Comments
1Scope jobFully understand the complexity of the job and its knock-on consequences to the business and personnel safetyPlanner
2Plan job tasks and risk assess each oneDevelop line-of-sight task list to complete the job correctlyPlanner
3Write job procedureDevelop details of all activities in each task and the required standards to be met for eachPlannerApply Creative Disassembly steps
4Secure parts and materialsPurchase all needed parts and materialsPlanner
5Secure external resourcesPurchase the use of all sub-contracted labour, equipment and servicesPlanner
6Schedule jobTimetable the job for the approved date and timeScheduler
7Coordinate resourcesEnsure all parts, materials, services, equipment and people are available at the necessary timeScheduler
8Allocate job to maintainerSelect competent persons to do the workSupervisorCompetence is proven by education, training, skills and experience
9Creative disassembly first stepReview equipment history, observe equipment in operation, check for distortionMaintainerUse creative disassembly checklist
10Help Operator make equipment safeMake all necessary preparations for safe plant access and handover to do the whole jobMaintainer
11Provide safe plant and safe accessProvide plant and equipment safe to access and available to work on safelyOperator
12Equipment handoverConfirm the equipment is safe and accept the equipment handover from OperatorMaintainer
13Creative disassembly second stepObserve equipment condition, location, local environment and distortion changesMaintainerUse creative disassembly checklist
14Disconnect drive couplingYou will need to describe this in clear detailMaintainer
15Unbolt adaptor from voluteYou will need to describe this in clear detailMaintainer
16Unfasten pump from baseYou will need to describe this in clear detailMaintainer
17Separate pump from pump setYou will need to describe this in clear detailMaintainer
18Take pump to workshopYou will need to describe this in clear detailMaintainer
19Separate wet end and bearing casingYou will need to describe this in clear detailMaintainer
20Remove mechanical sealYou will need to describe this in clear detailMaintainerKeep seal safe from damage and dirt
21Remove bearing coverYou will need to describe this in clear detailMaintainer
22Extract drive end bearingsYou will need to describe this in clear detailMaintainer
23Remove shaft from bearing housingYou will need to describe this in clear detailMaintainer
24Remove wet end bearingYou will need to describe this in clear detailMaintainer
25Micrometer both bearing journalsRebuild pump to precision standards including Creative Disassembly third step requirementsMaintainerTolerance and form to be within OEM specs
26Micrometer both bearing housingsYou will need to describe this in clear detailMaintainerTolerance and form to be within OEM specs
27Check shaft straightnessYou will need to describe this in clear detailMaintainerTolerance and form to be within OEM specs
28Mount wet end bearingYou will need to describe this in clear detailMaintainer
29Position shaft in bearing housingYou will need to describe this in clear detailMaintainer
30Mount drive end bearingsYou will need to describe this in clear detailMaintainer
31Mount adapter to housingYou will need to describe this in clear detailMaintainer
32Place mechanical seal on shaftYou will need to describe this in clear detailMaintainer
33Take pump back to pump set locationYou will need to describe this in clear detailMaintainer
34Position pump into pump setYou will need to describe this in clear detailMaintainer
35Assemble bearing housing/adaptor to voluteYou will need to describe this in clear detailMaintainer
36Connect drive couplingYou will need to describe this in clear detailMaintainer
37Align pump and drive motor shaftsYou will need to describe this in clear detailMaintainer
38Locate mechanical seal in final positionYou will need to describe this in clear detailMaintainer
39Put oil onto bearing housingYou will need to describe this in clear detailMaintainerUse correct oil grade
40Make pump set safeYou will need to describe this in clear detailMaintainer
41Clean and tidy work faceYou will need to describe this in clear detailMaintainer
42Hand back to OperatorYou will need to describe this in clear detailMaintainer
43Commission pump setYou will need to describe this in clear detailOperator
44Complete work order reportYou will need to describe this in clear detailMaintainer
45Return tools, equipment and materials to StoreYou will need to describe this in clear detailMaintainer
46Update databasesPut necessary information into the planning and engineering databases for future usePlanner
Table 2 Example of Line-of-Sight High-Detail Job Plan 

Many people would question the high level of detail in this job plan. The reason so many steps are listed is to create a clear task-to-task line-of-sight workflow process. You need this level of job flow detail to fully plan and accurately track the job progress from its request to its completion. 

Another question often asked is why Tasks 1 to 8 are noted in the job plan when they are not done by the Maintainer. Because it is a job plan you need to show Tasks 1 to 8 and Task 46 so that the Planner, Scheduler and Supervisor are given clear authority and responsibility to make sure the job is planned, controlled, and done correctly the first time. Showing these tasks also makes clear how important they are for the successful performance of the maintenance work itself. If the planning, scheduling and supervision for the job is poorly done it reduces the chance of the job going right. 

A high-detail Job Plan makes clear to everyone throughout the company what is necessary to do a job and the resources and effort that will be required to complete it properly and safely. Imagine how much more unlikely it would be that this job will be done efficiently, effectively and right-first-time if there were no specifics of exactly how the job can be done correctly, right-first-time. 

Remember that this job plan is not the job procedure for the maintenance work being undertaken. It is quite likely the job procedure to be followed by the maintainer is 200 or more activities long and will include dozens of tests and spot inspections to prove the pump was assembled and installed precisely. If the aim of the repair was to have a pump with bearings that would last failure free for a 

decade or more, then that longevity is only certain with a job procedure that specifies the necessary reliability-creating quality, backed up with proof tests and inspections to ensure the necessary task precision was achieved. To give a work order to the maintainer with only a job plan and without a complete, thorough job procedure means you have no way to control the work quality. It makes hope and luck that the maintainer knows exactly what to do, and cares enough to do it well, as your only way of getting quality work done—that is an impossible way to lasting reliability success. 

Draw the Job Plan Flow Chart 

To further improve the chance of doing the job right-first-time and delivering a long-lived, highly reliable machine you then develop the workflow process diagram and include the milestone work quality inspection points. Figure 2 shows the work process flow diagram for the pump roller bearing replacement. On the flow diagram for the job are each of the Job Plan steps listed in the tabulated Job Plan. 

For this example the Maintenance Job Plan and the Job Flowchart took me two hours to develop. In doing that I have created a template for all other back-pullout centrifugal pumps in the operation. For the rest of my career I will never again need to invest another two hours in creating a centrifugal pump bearing replacement Job Plan. 

Making a work process flowchart of the Job Plan gives us several great advantages, such as: 

  • • It is a ‘picture’ of the job that can be discussed with all people. 
  • • It shows that the job tasks obviously form a series arrangement. Series arrangements are high risk because any vital task done wrong makes the whole job go wrong. (In fact, if the critical tasks that create reliability are poorly done you can be sure that the bearings will fail too soon and the pump will again be out of service for repair.) 
  • • It makes the job into a process with measurable inputs and measurable outputs. 
  • • You can now build performance KPIs into the process and measure workflow effectiveness. 
  • • You can set clear quality test points into the work process to prove reliability was built into the machine. 
  • • It allows you to do Lean value stream mapping for workflow efficiency improvements. 
  • • Each task can be risk analysed to identify how it can go wrong and what to do to prevent its failure. 

What seems at first glance to be a lot of unnecessary work for a maintenance planner to do when planning a job, is in fact of great importance, value, and lasting worth to the organisation. If you want to build a great business that does great things, then you need to make sure that world class quality work done right-first-time is everyday standard practice in your company. 

If you have any questions about this approach to accurate maintenance job planning, please ask. We also provide Maintenance Planning and Scheduling training via online distance learning and live streamed webinars. Visit the website to get the details. 

My best regards to you, 

Mike Sondalini 

Filed Under: Articles, Maintenance Management, on Maintenance Reliability

About Mike Sondalini

In engineering and maintenance since 1974, Mike’s career extends across original equipment manufacturing, beverage processing and packaging, steel fabrication, chemical processing and manufacturing, quality management, project management, enterprise asset management, plant and equipment maintenance, and maintenance training. His specialty is helping companies build highly effective operational risk management processes, develop enterprise asset management systems for ultra-high reliable assets, and instil the precision maintenance skills needed for world class equipment reliability.

« Leadership in the ISO 31K Context
The Effect of Interest/Discount Rates on Asset Replacement Decisions »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Headshot of Mike SondaliniArticles by Mike Sondalini
in the Maintenance Management article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy