Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / on Product Reliability / Apex Ridge / Estimating Time to Demonstrate Reliability

by Adam Bahret 1 Comment

Estimating Time to Demonstrate Reliability

Estimating Time to Demonstrate Reliability

One of the most difficult challenges of incorporating reliability activities with program planning is estimating the time it will take to demonstrate reliability.  Demonstrated product reliability is typically measured as a confidence in a product’s capability to achieve a reliability goal. At product release, the business unit may feel comfortable with their target market and warranty goals with a demonstration of a 90% confidence in the products reliability goal of 99.1%.

Achieving a demonstrated 90% confidence in a product is in direct opposition with any “time to market” goal that has been established, no matter what the product or technology is. There are several ways to translate test time to demonstrated confidence.  Using one common method this confidence of 90% in a 99.1% reliability would take running 254 production equivalent units to full life, with no issues.  So the reliability team is effectively asking the program if they can be the first customer and have enough time and resource to run 254 products to life.  I have never in my career seen a request like that granted, or even seriously asked. I think you would mention those figures only to put your actual request in perspective.

The reliability demonstration program will then typically take a two-prong approach.  A “Reliability Growth” (RG) program will be launched as soon as the first full system prototype is available.  This program will look to systematically measure and improve the reliability by running the system in a manner as close as possible to a customer use case and environment.  The RG program will permit for a growing confidence in the reliability goal to be demonstrated.  This confidence measurement will assist with program management decisions by producing a quantifiable risk of the product being able to achieve it’s reliability goal.  Specific confidence percentages can be associated with program phases.

  • At the completion of the “Proto 2” phase, a confidence of 30% will be demonstrated.
  • At the first “trial production run” a 60% confidence will be demonstrated.
  • At release, a 70% confidence will be demonstrated.

The second prong of the confidence demonstration approach is executed at the sub-assembly level.  A reliability allocation model can derive reliability goals for sub-assemblies based on the high-level product goal.  This can be advantageous because often sub-assemblies are available for test before the high-level system is ready to be operated.  If there are subassemblies that are high-risk they can go through the “test and fix” iterations with a specific goal.  This is instead of an open-ended improvement that may be stopped too early or continue unnecessarily.

The key is to synchronize with the program leaders early in the planning process.  Expectations for what can be demonstrated at each phase of the program should be set.  This goes both ways.  The reliability team communicates that it is not possible to demonstrate a 90% confidence in a 99% reliability unless they are willing to postpone release by 10 months from the original product date.  The program leaders understand what they will have to provide with regard to test units, resource (fixturing, lab space), and program schedule to achieve the agreed upon program goals.

-Adam

Filed Under: Apex Ridge, Articles, on Product Reliability

About Adam Bahret

I am a Reliability engineer with over 20 years of experience in mechanical and electrical systems in many industries. I founded Apex Ridge Reliability as a firm to assist technology companies with the critical reliability steps in their product development programs and organizational culture.

« The Watch Keeper
RACI: The Final Step in the Roles & Responsibilities Process »

Comments

  1. Hilaire Perera says

    September 13, 2017 at 4:50 PM

    Reliability Demonstration Testing (RDT) is ideally performed when the product development is stable, with all design flaws removed. For most companies RDT is performed at either the Pilot Production phase, or first mass production as a final qualification before initiating full blown production.

    Reply

Leave a Reply to Hilaire Perera Cancel reply

Your email address will not be published. Required fields are marked *

Article by Adam Bahret
in the Apex Ridge series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy