Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / CRE BoK and Risk Management

by Fred Schenkelberg 2 Comments

CRE BoK and Risk Management

CRE BoK and Risk Management

The New ASQ CRE BoK Group: Risk Management

The 2018 ASQ CRE Body of Knowledge has a new top-level section titled II. Risk Management.

A few of the topics, 6 of the 9, are the same or similar to topics in the previous CRE BoK. There are three new topics that extend the reliability engineers need to know, understand, and use risk management tools.

Overall the new section of Risk Management has three groups of topics:

A. Identification

B. Analysis

C. Mitigation

Let’s take a quick look at the details in this new section and highlight the changes and new elements.

Risk Identification

Risk management techniques topic is new. Building on the suite of tools and approaches to identifying risks in ISO standards and literature, we should be familiar a host of ways to identify and manage risks. The inclusion of the phrase, risk management framework, implies we’ll are familiar with the various available frameworks.

There are frameworks specific to industries and others that are more theoretical than practical. The basic ability to list risks that may impact reliability performance and safety are not new. We often have to consider risks involving technical, scheduling and financial concerns. The basic concept is not new, other than understanding a risk management framework.

Type of Risk is not a new topic. There are a few articles on types of risk under the tag I. B. 3. Types of Risk

Risk Analysis

There are plenty of risks that we should consider within an organization, within a product development process, or within an asset management program process. Just listing the risks is a start, yet we do need to sort, prioritize, organize, and understand the risks in order to deal with them efficiently.

All 6 topics within this group are familiar from the previous body of knowledge. There are a few minor changes and most of the topics are breakout topics from the previous BoK topic of I. C. 3. System Safety.

  1. Fault tree analysis is the same as before, yet did drop the mention of the success tree analysis. See III. A. 5. Fault Tree Analysis and Success Tree Analysis for a few articles on the topic.
  2. Failure mode and effects analysis combines a portion from system safety and the reliability in design and development topic of FMEA and FMECA.
  3. Common mode failure analysis remains unchanged moving from the reliability in design group to risk management.
  4. Hazard analysis is not new as it was part of the previous system safety topic.
  5. Risk matrix is also not new, likewise a parts of the system safety topic.
  6. The system safety elements not extracted to stand alone topics make up the topic system safety. It seems to be a catch all topic focused on identifying safety related issues and considering impact on the program and customers. Of course it include the concept of doing something about the safety issues as well.

Risk Mitigation

This sub group of Risk Management does not have any topics, rather it is a topic in itself. This topic pulls the liability topic from the previous BoK topic of I. A. 5. Failure consequence and liability management and the risk mitigation plans from III. B. 3.  Parts obsolescence management.

Summary

Much of the new top-level group called Risk Management is not new. A few topics will receive more attention and a note to fit reliability work within a larger risk management framework.

Seems we’ll need to add a few new articles on these topics in the coming weeks to flush out the information viable to you as you do your reliability engineering work.

Do you work within a risk management framework within your organization? If so, is it available via a standard or book? Which one? How is the framework working with reliability engineering? Let us know in the comments section below.

Filed Under: Articles, CRE Preparation Notes, Risk Management Tagged With: Risk management process

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Stuck at Testing of Digital Combinational Logic—Part 2
Locating Pressure Relief Valves »

Comments

  1. V says

    December 29, 2017 at 2:34 PM

    Hello!

    Risk management is used pretty extensively in the oil & gas and power generation industries. The approach used is broadly similar to the RPN methodology specified in the CRE BOK. There isn’t a specific book that is used. The risk assessment methodology varies between being a purely qualitative approach (Probability X Consequence resulting in a Risk Rank) to a more quantitative approach where the risk ranking is determined based on a cost based or a production (barrels produced). An example for an actual application would be determining inspection/maintenance intervals based on a Risk Based Inspection (RBI) approach.

    A lot of times the actual methodology is built around the framework of the corporate risk model of organization. Generically, it is similar to RPN but the details tend to be slightly different. Hope this helps. Please feel free to let me know if you need more information.

    Thanks!

    Reply
    • Fred Schenkelberg says

      December 29, 2017 at 2:42 PM

      thanks for the insight, cheers, Fred

      Reply

Leave a Reply to Fred Schenkelberg Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy