Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / 5 Steps to Create a Reliability Plan

by Fred Schenkelberg 1 Comment

5 Steps to Create a Reliability Plan

5 Steps to Create a Reliability Plan

A specific reliability plan may include any number of specific tasks. To build an effective plan you need the knowledge of the individual tools and techniques, plus how they may fit together to create an overall plan to achieve your goals.

Reliability Goals

Of course, this starts with establishing complete reliability goals that include function, environment characterization, probability of success (reliability) and duration.

I recommend setting specific goals for setup/installation (early life), the warranty period and the expected customer use period.

For example, for an inkjet printer the goals may be stated as a device that prints b/w or color (reference engineering specification document for other functional details), in the home or office environment (reference environmental and use characterization documents for details), with:

  • 99% probability of successfully operating without failure for the first month after purchase,
  • 95% probability of successfully operating without failure for first year (warranty),
  • 90% probability of successfully operating without failure for 5 years (use life).

Make the goal clear, complete and connect to your business objective and customer expectations.

Reliability Modeling

Create a reliability model (reliability block diagram will work well here) that includes the breakdown of the reliability goals to the major elements of the system. For example, for a desktop computer, including display, motherboard, power supply, etc. Consider the internal temperature for the motherboard is higher than for the ambient.

Be sure the math works out so if each element meets their reliability goal the system meets the overall goal, too.

Reliability Estimates (not parts count predictions)

Estimate reliability of each element of the model — and compare/adjust the goals to still achieve the overall goal. Compare the power supply, motherboard, and other elements reliability performance to the goal and roll up to system goal expected performance including a breakdown of what failures to expect and when. Use engineering judgment, vendor data, literature, field data, and internal life testing to create suitable estimates to populate the model.

Identify large areas os poor or uncertain estimates and take steps to get better life estimates, also identify areas that do not meet budgeted target and evaluate options that still achieve the objective.

Track Progress

Track reliability issues any defect, bug, or prototype failure, that would have caused a system failure impacting the use of the system by the customer.

Track date/time of arrival of the issue and plot using mean cumulative function or reliability growth models (plot count of failures (Y) vs time (X) – look for the rate of arrival to taper off as the design mature. This requires actually fixing the issues as testing continues.

This shows progress resolving issues and if the team is finding and solving enough issues fast enough.

Write the Reliability Case

Create a white paper or report that details the rationale for expected reliability performance. It should include the goal, model, and evidence supporting reliability estimates. It should also include what is known, unknown (or not well known) and degree of risk to reliability performance.

—

The intent of a reliability plan is to support decision making across the team and by management as you work to achieve a product that meets you customer’s reliability expectations.


 

Related:

How to Assess Your Reliability Program (article)

Purpose of a Reliability Program (article)

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Reliability plan

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Reliability Block Diagrams Overview and Value
Uncovering Hidden Field Failure Problems »

Comments

  1. SPYROS VRACHNAS says

    April 11, 2020 at 7:33 AM

    I think that of equal importance in a Reliability Plan may be:
    – Who does What and When (people involved).
    – Selection of components and their application (derating?).
    – Reliability requirements on subcontractors, if any.
    – FMEAs.
    – Who, When and How is Reliability Testing performed (verification, validation, demonstration, life testing?).

    Reply

Leave a Reply to SPYROS VRACHNAS Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy