Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Waterfall Test Planning

by Fred Schenkelberg 1 Comment

Waterfall Test Planning

Waterfall Test Planning

A Waterfall Test Planning Approach to Product Reliability Environmental Testing

I may have the name, waterfall, used incorrectly here.

Years ago I learned from a former Apple reliability group manager how to organize reliability and environmental related testing where samples cascade through a sequence of stress conditions and evaluations. He called it waterfall testing.

When Failure Mechanisms Require a Sequence of Stress to Occur

We rarely have enough samples, time, or testing capability to evaluate the range of stresses and failure mechanisms desired. Furthermore, some failure mechanisms require a sequence of damage to occur before a failure occurs.

For example, it is rare to have the ability to thermal cycle, vibrate and elevate humidity stresses in a single chamber. If we know the our design’s seal deteriorates when exposed to high humidity conditions, while the primary cause of failure is due to thermal cycling and vibration. The damaged seal permits the ingress of liquid water resulting in corrosion of critical electrical and mechanical components.

 

water fall testing example 1Just testing using vibration and thermal cycling doesn’t impart the humidity driven failure mechanism (aging). Just using humidity without mechanically stressing the seal will not break apart (crack or displace) the seal. In this simple example, we need to age the seal using humidity first, then expose the the unit to thermal cycling and vibration before evaluating the seal for functionality.

Thinking through each stress and associated excited failure mechanisms you may find a sequence of aging and follow on applications of stress or evaluations that minimize both testing time and required testing resources.

Evaluating Independent Failure Mechanisms or Subsystems

Another benefit of waterfall testing is the samples that survive one set of stresses may still be useful to evaluate a different set of stresses.

For example, we may be able to electrically stress a set of units for their ability to operate over a range of voltages and current conditions (power line testing). The same units remain useful to evaluate color fastness of the enclosure coatings.

water fall testing example 2Instead of using brand new prototypes for both the power line testing and a separate set of prototypes for the color fastness testing. We could sequence the use of the same samples for both tests. In this case both tests are relatively short and the stresses applied to not interact to alter either test’s results.

Continuing the example, we may suspect the exposure to humidity may alter the power supply’s and enclosure coatings to survive the power line and color fastness testing respectively. Yet, we’re not really sure about the degree of damage humidity aging will impart (e.g. Is it a problem or not).

Therefore, after running the two different tests on units, place the same units in a humidity chamber to evaluate functionality after exposure to high temperature and humidity conditions (a common environmental test), then use the surviving units to evaluate power line and color fastness again.

In each of these environmental tests we are simply checking the robustness of the design for major issues. Each test is based on environmental testing standards and the intention is to due a set of checks for environmental stress induced failures.

Any failures that do occur require careful failure analysis to determine next steps to improve the design’s robustness.

Thinking though the effects of each stress and the types of failure mechanisms involved and of interest, you may be able to arrange the use of a reasonable set of prototypes through a sequence of stresses, thus significantly reducing the number of prototypes required for testing.

water fall testing example 3

This is Different Than the Product or Software Development Model

Doing a bit of research found that the waterfall model is defined by The Economic Times as

The waterfall model is a classical model used in system development life cycle to create a system with a linear and sequential approach. It is termed as waterfall because the model develops systematically from one phase to another in a downward fashion. This model is divided into different phases and the output of one phase is used as the input of the next phase. Every phase has to be completed before the next phase starts and there is no overlapping of the phases.

In the book Rapid Testing by Robert Culbertson, Chris Brown, and Gary Cobb, they define waterfall testing in a similar fashion as the waterfall model description. The authors use image (waterfall model figure) of one step leading to the next step in a flow down pattern.

waterfall model

The waterfall model with the associated test planing and sequencing is a common model for systems and software development. It doesn’t appear to include the detailed application of stresses and evaluations in order to minimize testing time, costs, and complexity.

If the type of environmental testing planning has another name, please let me know, and if there is reference that we should cite. In the meantime, you can take a closer look at your next environmental test plan and possibly puzzle out significant savings.

Filed Under: Articles, Reliability Testing Tagged With: Environmental testing

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Manufacturing Test Approaches and Product Expectations
Shaft Coupling Selection Issues »

Comments

  1. Laxman Pangeni says

    July 11, 2018 at 9:49 PM

    Hello Team,

    Nice to get an alternative name to the “sequential tests” that we refer to for ECU (Electronic Control Unit) testing. This is the test most common in companies like GM, Daimler, SCANIA, Robert Bosch, etc.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy