Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Water Hammer and How it is Controlled

by Mike Sondalini Leave a Comment

Water Hammer and How it is Controlled

Water Hammer and How it is Controlled

When a control valve or manual valve is shut fast in a full pipeline of moving liquid, the liquid comes to a sudden stop. If the pipe suddenly starts banging and thrashing about you can be sure a water hammer was created. 

To stop anything already moving requires a force pushing against it to take away its momentum or energy of motion. A valve shut quickly in a pipe full of moving liquid stops the liquid dead. The valve halts the momentum by force and an opposite, reaction force is created in the liquid as it hits the valve and compress against it. During the split second it takes to squeeze the water against the valve a huge pressure surge develops. It is the pressure surge from the change in momentum that creates the water hammer that rattles pipes.

The pressure wave rushes back up the pipe, stopping the liquid movement as it passes, and spurts out the inlet end leaving a low pressure in the pipe. With low pressure in the pipe the liquid rushes back down to the closed valve and hits it again. The liquid is compressed against the valve and for a second time it is reflected back up the pipe. The cycle repeats until the liquid finally comes to rest when the energy is dissipated through pipe stress and the liquid movements.

The pressure surges travel at the speed of sound for that liquid and reachs hundreds of kilometers per hour. The more dense a liquid, (higher specific gravity) the faster the pressure surge. More dense liquids are heavier and have bigger momentum for the same velocity. This means denser liquids produce higher pressures when a valve is shut fast.

Any valve, which is closed faster than the time taken for the pressure surge to travel from the valve back to the inlet and return to the valve again, will produce a water hammer. Calculations can be done to determine the closing rate of a valve to be sure it is slow enough not to produce a hammer. The time depends on the liquid and pipe physical properties and the length of pipe.

Managing Water Hammer

There are three ways to manage water hammer. The first and best is to not create it in the first place. Since the hammer results from a sudden change in momentum it becomes necessary to slow the liquid gradually until it is stopped. This requires a slow valve closure. ‘Slow closure’ means the time it takes the valve to stroke, from open to closed, is longer than the time it takes the pressure wave to travel back and forth to the valve. Regulating valves can be installed in the air vent line of air actuated control valves to slow the speed of closing.

The second technique is to install a surge tank in the pipeline just upstream of the valve. Any water hammer in the pipe blows into the surge tank and the pressure is vented safely into the tank void.

Another technique is to install pressure arrestors in the pipeline. These are gas-pressurised chambers where a piston is pushed against the gas by the water hammer. The piston compresses the gas and absorbs the pressure surge.

Mike Sondalini – Maintenance Engineer

[ninja_form id=431]

If you found this interesting, you may like the ebook Process Control Essentials.

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance Tagged With: Valves

About Mike Sondalini

In engineering and maintenance since 1974, Mike’s career extends across original equipment manufacturing, beverage processing and packaging, steel fabrication, chemical processing and manufacturing, quality management, project management, enterprise asset management, plant and equipment maintenance, and maintenance training. His specialty is helping companies build highly effective operational risk management processes, develop enterprise asset management systems for ultra-high reliable assets, and instil the precision maintenance skills needed for world class equipment reliability.

« Reliability Engineering and Leadership
Baldrige Adds Enterprise Risk Management »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by
Mike Sondalini
in the
Plant Maintenance series.

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy