Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Variables Control Chart Background

by Fred Schenkelberg Leave a Comment

Variables Control Chart Background

Variables Control Chart Background

What are Variables Control Charts?

From NIST Engineering Statistics Handbook, section 6.3.2, with edits and additions.

During the 1920’s, Dr. Walter A. Shewhart proposed a general model for control charts as follows:

Let w be a sample statistic that measures some continuously varying quality characteristic of interest (e.g., thickness), and suppose that the mean of w is $- {{\mu } _{w}} -$, with a standard deviation of $- {{\sigma } _{w}} -$. The sample means have an approximately normal distribution based on the central limit theorem.

Taking sample measurements provides a way to estimate the current production output, in this case, thickness. If the mean and standard deviation values remain relatively constant, we can determine the process is in control.

If the sample shows a convincing change versus the expected, we say the process is out-of-control. When a stable process become “unstable” or out-of-control” it is a signal that something has changed and requires investigation and possibly intervention.

Variation

Every process has variation. When the sample measurements indicate a large change, it most likely means the underlying and unknown population has changed. We can expect about a +/-1.5 sigma change in the sample mean with an unchanging or in control process. By convention, when the sample indicates a +/- 3 sigma change, there is only about a 2.5% chance the sample is from the previously stable process.

Thus we place the control limits at +/- 3 sigma from the average of the samples, $- \bar{X} -$. Then the center line, the UCL and the LCL are

$$ \large\displaystyle UCL={{\mu } _{w}}+{{\sigma } _{w}}$$

$$ \large\displaystyle \text{Center Line}={{\mu } _{w}}$$

$$ \large\displaystyle LCL={{\mu } _{w}}-{{\sigma } _{w}}$$

where k is the distance of the control limits from the center line, expressed in terms of standard deviation units. When k is set to 3, we speak of 3-sigma control charts.

Historically, k = 3 has become an accepted standard in industry.

The centerline is the process mean, which in general is unknown. We replace it with a target or the average of all the data. The quantity that we plot is the sample average, $- \bar{X} -$. The chart is called the $- \bar{X} -$ chart.

We also have to deal with the fact that $- {\sigma} -$ is, in general, unknown. Here we replace $- {{\sigma }_{w}} -$ with a given standard value, or we estimate it by a function of the average standard deviation. This is obtained by averaging the individual standard deviations that we calculated from each of m preliminary (or present) samples, each of size n. There a couple of ways to estimate standard deviation for control charts and we’ll discuss that in another post.

Looking at standard deviation

It is equally important to examine the standard deviations in ascertaining whether the process is in control. Learn to focus on controlling the standard deviation first, then work on the average. When the standard deviation is out of control the indications about the average may only be a reflection of a change in the standard deviation.

Think target practice

One analogy is in target shooting. First control your process for how you aim thus creating a tight shot group (small standard deviation and stable), then adjust the aim to focus on the target.

That is the basic idea for variables data control charts.


Related:

Selecting Control Charts (article)

8 Steps to creating an X-bar and s control chart (article)

Central Limit Theorem (article)

 

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Statistical Process Control (SPC)

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Just Plot The Data
Building Reliability Leadership »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy