Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Variable Selection for Control Charting

by Fred Schenkelberg Leave a Comment

Variable Selection for Control Charting

Variable Selection for Control Charting

Every process should operate stably. Every process may have many measurements available to monitor either various aspects to the final product or the assembly equipment. There may be hundreds of possible items to measure and monitor.

We do not have the resources nor time to apply control chart principles to each possible measurement. Control charts do not directly add value and they have a cost to maintain and interpret. While it may be tempting to add a dozen or so control charts, as the cost increases the value quickly decreases.

How to decide what to measure

If it is not practical to measure and control chart everything that is possible, how do we decide what to measure?

In some circumstances, there is a dominant parameter that represents the key attribute of the process. In most cases, review the critical to quality elements of the process output. This may provide a basic starting point. They also represent the key process output variables (KPOVs).

One key consideration is to make the measurement as close to the process step that creates the KPOV and monitor at that point. Another consideration is to monitor inputs to the process when they have a strong correlation with the KPOV. The input variables are then key process input variables (KPIVs). The intention is to monitor elements that provide meaningful feedback to the process or provide a means to minimize scrap.

Every situation is different, yet the following may provide a guide to help you decide:

  • Safety – elements that impact human or environmental safety.
  • High defect rate – monitor and improve the processes to minimize defect and scrap rates.
  • Customer complaints – monitor and improve process aspects to reduce complaints.
  • Standards – show compliance with applicable standards.
  • Customer requests – they may have an aspect of a product that impacts their results.
  • Difficult processes – some setups and process operations just have more variability.
  • Direct measurement – have the person charting does the measurements.
  • High expenses – monitor and reduce the unwanted high costs of variability.
  • Secondary variables – items that help control the process
  • Incoming inspection – if the supplier is not maintaining sufficient control, these charts may provide evidence to help the vendor improve.

Start, review and adjust

When learning to control chart, look for one or more sources of measurements and practice. Just try it.

Become comfortable with the mechanics of creating a chart and interpreting the common and special causes as they occur. Always manually measure and chart before automating the process. Determine if the charted variable is worth the effort to measure first.

Then review your process and identify the KPOVs or KPIVs and establish the appropriate control charts. Collect data and regularly review that the charts are well maintained.

Periodically review the existing charts to determine if they are providing value. Does the chart actually help the process remain stable, reduce scrap, minimize costs, or what every is deemed of value for the process? If so, then continue, if not, then consider other elements of your process to monitor and improve.

Control charts once established are not like government agencies and must remain in place forever. Regular review, remove and restart charts as your process evolves and improves.

Creating/Detecting Real Control Charts

A real control chart is a living document and used regularly to make decisions to improve a process.

It is not behind glass on the wall near the entrance just for visitors. In my opinion, they should be manually done, dirty, on the line and charted by the person operating the process.

However the chart is compiled, it is real if it is used to make decisions that lead to either a stable process or an improved and stable process. Also, the variable measures should directly relate to a KPOV or KPIV – in short, the element measured should matter to the process or customer.


Related:

Selecting Control Charts (article)

Variables Control Chart Background (article)

Statistical Process Control Overview (article)

 

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Statistical Process Control (SPC)

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Understanding Customer Reliability Expectations
Function: A Reliability View »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy