Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Using Risk and Safety Analysis as Part of the Requirements Process

by Greg Hutchins Leave a Comment

Using Risk and Safety Analysis as Part of the Requirements Process

Using Risk and Safety Analysis as Part of the Requirements Process

Guest Post by Paul Kostek (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Frequently in my work as a systems engineer I’m faced with producing several artifacts for a project, typically a system architecture, model(s), requirements, safety analysis and risk analysis (management plan).

The challenge is many of these are treated as serial activities, items to be completed but not necessarily tied together.  To produce an architecture and requirements that reflect all of the known/identified issues we should be working on all of these activities concurrently or at the least have a first cut at the safety and risk analysis before starting the requirements.  From a project planning stand-point how these are shown on a schedule are driven by the size of the team and the project schedule.  “What do we need to complete a phase/gate review”  is how the schedule ends up being built versus what do we need to proceed with the systems design and architecture.

Risk Analysis

The safety (FHA/PSSA) and the risk analysis are important elements to the development of good (i.e. clear, unambiguous and verifiable) requirements.  Including issues identified during these analyses will insure we develop mitigations for safety/risk issues, eliminate rework and for the case of avionics help identify the appropriate Design Assurance Level (DAL) that the project will be certified to.  This activity on any project can ensure that the correct level of Verification and Validation (V&V) is planned.

While we may all agree with the importance of following these steps, we also know that schedule demands and need to get a product to market as soon as possible can lead to push back.  The challenge then, whether leading a project team or serving as a team member, is completing the early risk work before starting with solicitation of requirements.   Management needs to understand the importance of these tasks and the impact they can have if not completed at the proper stage on a project.

As an example we’ll at risks for a medical device and how we would address these as part of the design process.  Let’s pick an AED (automated external  defibrillator), a device commonly found in public places such as theaters, schools and airports.  One risk is the device does not operate when applied to a patient, the result of a failed battery.  This results in delayed/no delivery of therapy and can result in patient death.  Obviously a high risk that must be mitigated. We would write requirements that the device perform a self-test every 24 hours and if the battery has failed a unit fail light is set. This would also require that the operation/user instructions for the device require facilities where the units are installed do a check that the fail light is not on and the unit is available for use.

KOSTEK-1-requirements processAn AED is meant to be used by anyone in an emergency situation, so the instructions need to be clear to any user. While the AED will provide verbal directions, as part of risk mitigation for the case where the person does not understand the commands, either hard of hearing or they do not understand the language used by the device, visual prompts such as the figure below are provided.

To successfully complete the requirements for any project we need to identify the risk up front, consider how to address (mitigate) them in the design, or whether they can be addressed by documentation such as the users manual or the aural messages to the user.

Bio:

Paul J. Kostek is a Principal of Air Direct Solutions, a systems engineering/project management consulting firm. He works with companies in defining system architecture, system requirements, interface definition, verification planning, risk management and software development standards. Paul received his BS from the University of Massachusetts, Dartmouth.   Paul works in a range of industries including: aerospace, defense, medical device and e-commerce.

Paul is a long-time volunteer with several professional engineering societies including IEEE, AIAA, SAE, INCOSE and PMI.  He also writes for the CERM Risk Insights emagazine.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Angular Contact Bearings
Is Your Maintenance Program Aligned With The Business? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy