Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Unfit for Purpose

by James Reyes-Picknell Leave a Comment

Unfit for Purpose

Unfit for Purpose

The data in Maintenance Management Systems are very often “unfit for purpose”. When asked about why there is an Enterprise Asset Management or Computerized Maintenance Management system, the answer varies. Here are some reasons we’ve heard:

  1. It helps with the planning and scheduling of maintenance work.
  2. It helps us capture maintenance costs against the right cost centers.
  3. It helps us find the parts we need for maintenance jobs.
  4. It provides data for reliability improvements.
  5. We couldn’t possibly manage all the jobs without a system.

All are good reasons, but do we really get the advantages of our systems’ capabilities?

  1. Planning and scheduling – indeed these systems are designed to help here. Planning is built into most of the systems on the market, scheduling is often more challenging to program so quite often 3rd party packages are used. The key to using this capability is to have trained and capable planners who actually plan work. All too often there are no planners, or they spend their time chasing parts, not planning.
  2. Costs – if you have a well-designed asset register that corresponds to accounts in your chart of accounts, then this capture and tracking of costs can happen. Many have both but don’t link them in particularly meaningful ways. The chart of accounts is usually at a much higher level in the asset hierarchy so costs are aggregated at levels that can be less meaningful to maintainers. In practice, we often find the use of purchasing cards, blanket work orders, work orders not tied to the correct asset, work orders not linked to any asset, or no work orders at all. Those all defeat the purpose.
  3. Parts – these are tracked in storeroom inventory management systems that may or may not be part of the maintenance system or they might be linked to it through some form of module integration. It is important that the right parts are linked to the right equipment and that plans identify them. Lack of planning (see above) often undermines this. Poor forecasting of demand (a planning function) leaves the storeroom guessing about future needs. Maintainers often stash parts (from direct purchases) in their own little hide-aways. This “hides” usage from stores and information about demand, and even which parts to have (or not), also degrades over time. Stores, seeing an increasing volume of slow-moving parts get rid of those that haven’t moved. Invariably something that was truly needed as an insurance spare is then lost. When the equipment that was intended for breaks down, the downtime is extended, purchasing price and logistics costs grow.
  4. Reliability – knowing that work was done is not always an indicator that something had failed or would have failed. That must be identified to be useful. The actions that reduce the ability to track costs correctly (see #2) also reduce the ability to have useful reliability data. To be useful for reliability we also need the data to relate to failure modes. Rarely do we see a direct link between a failure mode and the work performed and tracked on work orders. WOs track transactional information. Failure modes are about failure events and causes and aside from triggering a loss of function that in turn triggers the need for repairs, have nothing to do with the rest of the transactions. In most cases, it is the loss of functionality that gets noticed and recorded, not the failure mode and causes. Most reliability engineers will carry out their own studies to get data that is fit for their purposes – if indeed you have a reliability engineer.
  5. Can’t manage without it – the tool (CMMS/EAM) is software and it has a lot of rules for its use that must be followed, or you can’t use it effectively. Many maintainers struggle with aspects of using their systems. In those cases, it is actually a barrier to effective work execution. We’ve even found planners that can’t use the systems properly. Usually, it stems from a lack of access (for most trades) and/or training (for everyone). This author is just old enough to recall working in maintenance without computerized systems and we managed quite well. The system isn’t really necessary at all, but it can be helpful. In terms of reducing the effort to find information (e.g.: for parts), sort jobs into schedules, re-use job plans, reducing paperwork, etc. these systems are great. But if they get difficult to use or people are not trained in their use, as well as their roles in your maintenance processes, then the systems are misused or ignored.

When we fail to set our systems up properly and train the right people in how to use them, in order to do those very things that we say we want the system for, then we set ourselves up for failure. The systems don’t get used to their full capability and they then fail to deliver what we said we wanted from them. The fault rarely lies with the software, but with the organization that failed before even turning the users loose on it.

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Successful Reliability Centered Maintenance (RCM) Implementation
List of Essential Root Cause Analysis Tools to Use In the RCA Process »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy