Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Understanding the Geometric Distribution

by Ray Harkins 1 Comment

Understanding the Geometric Distribution

Understanding the Geometric Distribution

Coauthored with Mark Fiedeldey

The geometric distribution is a discrete distribution often encountered in reliability work, which contains some valuable properties worth understanding. Let’s take a look at some of these characteristics.

This model is useful when trying to answer the question, “How many trials are needed to get a particular result?” So, the number of trials is not set initially; we need to figure that out.

The geometric distribution is similar to the binomial in that the trials are independent. That is, the result of one trial does not affect any of the other results. Also similar to the binominal, there are only two possible outcomes like “pass” and “fail”. And finally, the outcome probability for each trial is the same. In other words, this distribution isn’t used when testing various designs of a part that would likely have different probabilities of failure. But unlike the binomial, the trials in the geometric distribution are not fixed.

The probability mass density function (PDF) for the geometric distribution is written as follows:

$$ \displaystyle\large f\left(x\right)=p\left(1-p\right)^{x-1} $$

Where f(x) is the probability that the first failure occurs on the xth trial, and p is the probability of failure for each test sample.

For example, on a fair die there are six possible outcomes, each with a probability of 1/6. Therefore, we may want to know the probability of rolling a “6” for the first time on the fourth trial, and NOT on any roll prior to the fourth.

Let’s consider the assumptions to determine whether this can be solved using the geometric distribution.

First, given that the outcome of one roll has no impact on the outcome of any other roll, the rolls are independent. 

Second, there are only two possible outcomes: “6” or not “6”. Of course, we could roll any of the six numbers on a die, but it’s only the “6” we’re concerned with. The other values are irrelevant in our analysis.

Third, the probability of rolling a “6” is the same for each roll.

And lastly, we have no idea how many times we’re going to have to roll the dice to get a 6. It might come up on the first trial. It might be the fifth trial, might be the tenth trial. We don’t know. We’re just going to have to roll the die again and again until we see a 6.

Given these four conditions, applying the geometric distribution to this problem is appropriate.

Let’s plug in the numbers.

equation_1.pdf since we’re interested in the probability of rolling a “6” on the 4th roll, and equation_2.pdf since the probability of rolling a 6 (or any other number) is 1/6th. Therefore,

$$ \displaystyle\large f\left(4\right)=1/6\left(1-1/6\right)^{4-1} $$ $$ \displaystyle\large f\left(4\right)=0.0965 $$

The probability of rolling a 6 for the first time on the 4th roll is therefore just under 10%.

Continuing to the cumulative density function (CDF), the sum of all the individual probability densities up to the point that we’re evaluating, we can use the following formula,

$$ \displaystyle\large F\left(x\right)=1-\left(1-p\right)^{x} $$

In this equation, an uppercase “F” is used as a means of distinguishing it from the PDF. 

From our previous example of rolling a die, well, what’s the probability of rolling a “6” by the third roll? In other words, what’s the probability of rolling a single “6” on the first, second or third roll. 

But we still don’t know what the number of trials we would need to do to get a 6. It could be 1 attempt, 10 attempts, or some other number of rolls.

Plugging our numbers into the CDF, we get:

$$ \displaystyle\large F\left(3\right)=1-\left(1-1/6\right)^{3} $$ $$ \displaystyle\large F\left(3\right)=0.4213 $$

So we have about a 42% chance of rolling a six within the first three rolls of the die.

Moving to the world of reliability, imagine we’re planning a reliability test on a prototype part that’s expensive to manufacture. We don’t want to have to make any more of them than absolutely necessary. We also have only one test fixture in this scenario so we’re going to have to test all our parts sequentially.

The reliability requirement on our part is 90% on this test. How many parts do we need to include in the test to be reasonably assured that our prototype meets this requirement?

This is a case where using the geometric distribution will help.

Since the reliability of each part is 90%, then the probability of failure, p, is equal to 10%. Using our CDF formula, we can easily create a table of cumulative probabilities in Excel with the following formula:

pastedGraphic.png

Filling out our table up to 15 samples, we obtain the following results:

pastedGraphic_1.png

Interpreting the results, we find for instance that if the second sample fails, we have only a 19% probability that the prototypes are 90% reliable. Chances are, if I have a failure by the second sample, my parts are not good enough and I may want to perform some failure analysis and redesign my parts accordingly.

But if I have no failures, I have to test at least seven samples before having at least a 50% chance that the parts are 90% reliable. Down to 15 samples with no failures, we still have only an 80% chance of meeting our reliability goal. 

Therefore, if the parts are bad, we’ll find out early. But if the parts are good, it will be expensive to demonstrate with this test that our prototypes meet the reliability requirement. We may want to consider a means of accelerating the test or running the test longer to evaluate whether we actually have a 90% reliable part.

Mark Fiedeldey is a reliability engineer living near Cincinnati, Ohio.

[display_form id=362]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

About Ray Harkins

Ray Harkins is a senior manufacturing professional with over 25 years of experience in manufacturing engineering, quality management, and business analysis.

During his career, he has toured hundreds of manufacturing facilities and worked with leading industry professionals throughout North America and Japan.

« The Most Commonly Underused CMMS Features
Meeting Procrastination Risk or Productivity Opportunity »

Comments

  1. JD Solomon says

    March 31, 2022 at 4:49 AM

    Good to see a few articles on distributions from time to time. Would love to see a few on comparing different ones on the outputs of some simple Monte Carlo Simulations.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Logo for The Manufacturing Acadamey headshot of RayArticle by Ray Harkins
in the The Manufacturing Academy article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy