Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Understanding Plant Losses

by Joe Anderson Leave a Comment

Understanding Plant Losses

Understanding Plant Losses

The Way Losses are Calculated
and OEE/TEEP Calculation

In order to get a broad, clear picture of where to focus, you have to view your whole plant as a large system of fully manageable processes. No matter your role, your job is to improve plant processes, helping to produce the highest quality product, at the lowest price possible, in the safest manner. In order to see this big picture, you have to be honest and expose true problems within your facility. From that perspective, you will be able to recognize the different types of losses in your plant and how to secure significant gains in productivity by controlling those losses.

How to determine where to focus

The examples in this article use weekly numbers, but the same analysis can and should also be applied monthly, quarterly, and annually. Here we will look at how we apply metrics to some of the different loss types. Armed with an understanding of how your plant is losing productivity and how to measure those losses, you can effectively increase profitability. Let’s look at a few areas of loss.

Available Time To Produce (Loading)

  1. First, you figure all scheduled downtime. Remember your buckets and put time scheduled in each of the buckets: Changeovers, Engineering Planned Shutdown, Maintenance Planned Shutdown, Operations Planned Shutdown, or No Customer Orders.
  2. Add them all together to come up with your Scheduled Downtime.
  3. Then subtract that from total hours in a week (168 hours available).

Example: (Planned Maintenance of 24 hours) + (Changeovers of 4 hours) = 28 hours of scheduled downtime.
                (168 hours in a week) – (28 hours Scheduled Downtime) = 140 hours available to produce.

Loading Calculation: (140 scheduled production hours) / (168 hours in a week) = 83%

This gives you your Available Time To Produce, 140 hours per week or 83%.

Quality Rate

Start by taking your startup rejects and your in-process rejects, add them together, then subtract that value from your total units produced.

Example: (35 Startup Rejects) + (35 In-Process Rejects) = 70 Rejects.
               7,070 Total Units Produced.
               7,070 – 70 = 7,000 Good Units Produced.

Quality Rate Calculation: (Good Units Produced) / (Total Units Produced) or 7,000 / 7,070 = 99%

Net Good Processing Hours

Find your Net Good Processing Hours by dividing your Average Weekly Throughput by your Weekly Design Rate.

Example: Average Weekly Rate is 7,000 units produced.
               Weekly Design Rate is 100 units per hour.
              7,000 / 100 = 70 Net Good Processing Hours.

Then, divide your Net Good Processing Hours by your Available Time To Produce.

Example:  Available Time To Produce is 140 hours weekly.
                70 Net Good Processing Hours / 140 Available Hours To Produce = 50%

Net Good Processing Hours Calculation: (Average Weekly Rate) / (Weekly Design Rate)
                                                                     That is, (Weekly Units Produced) / (Weekly Design Units per Hour)

Availability

Begin by taking your Average Breakdown Downtime, Process Failure Downtime and Set/Adjustment Downtime, adding them together, then subtracting the total from the Available Time To Produce.

Example: (13 hours of Breakdowns) + (1 hour of Process Failures) + (1 hour of Setup/Adjustment) = 15 hours downtime
               (140 hours Available Time To Produce) – (15 hours Downtime) = 125 hours Availability per week

Availability Calculation: (125 hours Availability) / (140 hours Available Time To Produce) = 89% Availability

Performance

First, take your Actual Weekly Run Rate and subtract it from the Weekly Design Rate.

Example: (Weekly Design Rate of 100 per hour) – (Actual Weekly Run Rate of 85 per hour) = 15 units per hour lost.

To convert that loss to hours, divide the Actual Weekly Run Rate by the Weekly Design Rate, subtract that quotient from 100, then multiply that difference by the Availability (in hours per week).

Example: ( 100 – (Actual Weekly Run Rate) / (Weekly Design Rate) ) x (Weekly Availability)
                ( 100 – (85 units/hr / 100 units/hr) ) x (125 hours available to produce) = 19 hours in speed losses

Now, subtract the hours in Speed Losses from the Weekly Availability hours to get Available Time To Produce.

Example: (125 hours Weekly Availability) – (19 hours in Speed Losses) = 106 hours Available Time To Produce.

To find minor stops, subtract your Net Good Processing Hours from your Available Time To Produce.

Example: (106 hours Available Time To Produce) – (70 hours Net Good Processing Hours) = 36 hours of minor stops per week.

Performance Calculation: (Speed Losses + Minor Stops) / Weekly Availability
                                            (19 hours in Speed Losses + 36 hours in Minor Stops) / (125 hours Weekly Availabilty)
                                             (19 + 36) / 125 = 56% Performance

OEE/TEEP Calculations: OEE = Availability * Performance * Quality
                                           OEE = 89% * 56% * 99% = 49%
                                           TEEP = Loading * OEE     (Loading = Percentage Available Time To Produce)
                                           TEEP = 83% * 49% = 41%

7 Big Losses: Minor Stops: 36 hours per week
                        Speed Losses: 19 hours per week
                        Breakdowns: 14 hours per week
                        Process Failures: 1 hour per week
                        Setup/Adjustment Losses: 1 hour per week
                        Quality Startup Losses: 0.5 hour per week
                        Quality In-Process Losses: 0.5 hour per week

If these were your numbers, where would you focus?

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

About Joe Anderson

George has a MS in Reliability Engineering from Monash University, is a CMRP, and CRL. George has over 25 years of experience in the Life Sciences industry and food manufacturing. He is a CRL, CMRP, a Black Belt in Reliability, Uptime Award Winner and a CMRP of the Year recipient. He is a well recognized thought leader, change agent, speaker and teacher within the industry. He also teaches courses in Maintenance Management and Planning & Scheduling at the University of Wisconsin.

« You’re Using the Wrong Average!
How Should the Sample Size be Selected for an X-bar Chart? (Part II) »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Videos and Articles by George Williams



and by Joe Anderson

in the ReliabilityXperience series

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy