Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The reason why your Weibull Analysis is giving a poor fit

by Miguel Pengel Leave a Comment

The reason why your Weibull Analysis is giving a poor fit

The reason why your Weibull Analysis is giving a poor fit

When Weibull analysis is applied to complex, repairable systems – like mining equipment – care must be taken to ensure the analysis is applied to failure data exhibiting a common failure mode on the component-level, not the system-level.

This requires the reliability engineer to review the work order data at times and, ideally, the failed components themselves. Otherwise, the “Garbage In, Garbage Out” principle applies.

It is relatively well known in the reliability engineering community, that multiple failure modes in a simple Weibull analysis will give S-curves, dog-legs and in general a very poor fit to the failure data. This is because different failure modes will each have their own unique failure characteristics and as such their own Beta values and characteristic life (Eta). (this article does not cover multi-modal Weibull analysis where the failure modes are dependent).

Experience will tell us to trust the wellness of fit from the Weibull plot, and take caution when the fit is poor, even when you think your data is reliable.

This brings me to an example I experienced during some consulting work a while back…

A Reliability Engineer at one of my client sites contacted me about the strange results he was getting for his Pump replacement time- 2100 Hours! Normally for this particular pump we would expect 12K hours.

The Beta value from his Weibull analysis was of a value slightly higher than 1, indicating slight wear-out characteristics, but this final replacement interval calculation gave a quite unreasonable value. I dug into his model, and it turns out his calculations were correct, however the method of classifying the data was flawed.

The life data collected from SAP was simply the previous replacement hours/ pumps still running in suspension using the part counter reading, which normally is correct, however it turns out that the field maintenance workers would simply replace the full pump with a new one when it broke down, with various failure modes noted in the Work Order itself. These failure modes ranged from bearing failure, case wear-out to impeller damage due to cavitation. These failure modes were not separated into individual Weibull Analyses, and a multi-modal model couldn’t be applied as the failure modes were independent.

Mixing of failure modes of varying shape parameters in a single Weibull analysis will often return a shape parameter around 1, leading to the assumption of a random failure distribution. This phenomenon is known as “Drenick’s Law” (F. Drenick, R. (1960): The Failure Law of Complex Equipment; Journal of The Society for Industrial and Applied Mathematics.).

Although in this scenario, it was quite obvious that the hours were wrong and we were able to fix the issue, there are many component strategies out there in which the hours-based strategy doesn’t raise any eyebrows, yet has the same flawed basis as this case, leading to unnecessary costs down the track.

pardusconsulting.com

Filed Under: Articles, Asset Management in the Mining Industry, on Maintenance Reliability

About Miguel Pengel

Miguel Pengel is a Registered Professional Engineer based in Australia, with experience in a wide variety of heavy industries such as Mining, Smelting and Power Generation.

He holds a degree in Mechanical & Aerospace Engineering, as well as a Masters in Applied Finance from the University of Queensland.

Miguel has worked in Reliability, Mechanical, Production and Project engineering roles for some of the world's largest companies such as Glencore, Hitachi and Rio Tinto.

« Stochastic Nature of Stress and Strength
When Past Reliability is Good »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Asset Management in the Mining Industry logo Photo of Miguel PengelArticles by Miguel Pengel
in the Asset Management in the Mining Industry: A Blueprint for Operational Excellence article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy