Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The Project Approval Committee

by Robert Allen Leave a Comment

The Project Approval Committee

The Project Approval Committee

A project approval committee can be an effective way to enable business decision-making and ensure projects are successful.

Committees may be known as a project review or steering committee; however, consider the following (proposed) objectives as follows:

  • Approve new projects (and project resources)
  • Approve project phase (phase gate) completion
  • Approve project go-forward plans (including resources)
  • Cancel projects that no longer make business sense
  • Prevent rogue/unapproved projects from consuming resources
  • Direct / redirect projects to complete key tasks or deliverables before moving forward
  • Enforce project management planning and execution

With this approach, “approval” is more clearly the objective of the committee.

The project approval committee (PAC) would comprise of a team of senior management with the responsibility and authority to approve, prioritize new projects, and allocate resources accordingly.  Ideally, each PAC member votes his or her go/no-go or redirect decision.

Note from my previous article, the proposed product life cycle phase and gate structure lends itself to a gate (PAC) approval process.

Also note that the gate review (go/no-go/redirect) decision is not a technical decision; it is a business decision to proceed with the investment in the project.

While the scope of this article provides a (proposed) overview of a PAC role and responsibility, there are several additional considerations including:

  • PAC membership and voting criteria
  • Individual roles and responsibilities (PAC chairperson, PAC members, PAC facilitator, project manager, core team leader, functional managers, team members, etc)
  • Gate exit criteria
  • PAC presentation content (presentation by the team leader to the PAC)
  • Method (for the PAC) to manage and allocate resources
  • Business / financial decision metrics & analytical methods

While you may not have (or need) a project management organization (PMO), an experienced PAC process owner and facilitator can establish process clarity and build infrastructure for enhancing PAC effectiveness and improved business decision-making,   This is a key role and responsibility which can ensure effectiveness of the leadership team and, accordingly, should have support (for the process) from the highest levels of the organization.

Most organizations welcome clarity in project governance processes, especially with multiple projects and competing resources.  A project approval committee can be a significant step in the right direction.

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: Lean Project Management

About Robert Allen

Robert Allen has over 25 years of professional experience in the areas of product development, process improvement and project management. Rob was a key contributor to numerous deployments of lean sigma and project management organizations, most notably with Honeywell and TE Connectivity. Included in Rob’s experience are multiple certifications and over 25 years of practice in the development, teaching, execution, and leadership of product lifecycle, lean product development, DFSS, lean six sigma, project management, systems engineering and supply chain.

« Reducing Wear in Abrasive Conditions
A 2-Step Process to Improve Plant Performance »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Rob Allen
in the Product Development and Process Improvement series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Join PD&PI

[display_form id=369] Your email is safe and the opt-in here provides your permission to send messages concerning the PD&PI article list plus special announcements. Privacy Policy

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy