Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The Keys To Successful RCM Implementation

by Doug Plucknette Leave a Comment

The Keys To Successful RCM Implementation

The Keys To Successful RCM Implementation

If you have attended any Maintenance and Reliability conference in the last several years, chances are you have seen a presentation on the struggles of RCM implementation. Most present that over 70% of companies who attempt to get started with Reliability Centered Maintenance fail to implement the recommended mitigating tasks identified in their analysis.

While I don’t dispute these numbers, I can tell you the reason most companies fail to implement, is they have never used a methodology and tool that was designed to simplify RCM Implementation. In my first years working as an RCM Practitioner, Trainer and Consultant, I tried to address this issue by creating a contract for the team and managers to sign that clearly stated who would be responsible for implementation. While this improved the number of our RCM’s that got implemented to just over 50%, several RCM’s were not being implemented.

To understand why our customers would leave the opportunity of improvement sitting in a computer waiting for someone to take the initiative to act, we went back to talk with those who had failed to implement. While those who failed to implement had a number of excuses as to why they had failed to act, the specific causes associated with failing to implement were;

·        They didn’t know where to begin (No one had showed them how)

·        RCM Analysis data did not align with their CMMS

Addressing these causes, we revised our process and program to simplify the implementation phase of Reliability Centered Maintenance. As a result, our customers implementation rate is now 95%.

How did we accomplish this? We started by listening to our customers and by doing the following;

1.      We developed an RCM Database/Program that allows our customers to use their CMMS hierarchy to build the component registry. Matching hierarchy simplifies the transfer of tasks form the RCM Database back into the CMMS.

2.      We developed an implementation report that clearly organizes RCM tasks by task type, required trade and interval simplifying the process of building PM, PdM, Failure Finding and Operator Care Tasks.

3.      We built an interactive implementation report that allows customers to assign, track and report implementation progress.

As a result of our actions has cut the time it takes to implement the PM, PdM, Failure Finding and Operator care tasks from an average of 3 weeks (120 hours) to just over 1 week, (52 hours). In this year alone, we have worked with 9 different companies and 20 of the 21 RCM’s completed to date have implemented.

Being successful with RCM isn’t difficult when you work with a company that got its start by working to make RCM easy. If you’re interested in learning how to introduce as successful RCM program, please feel free to give us a call!

Douglas Plucknette is the President of Reliability Solutions Inc. and creator of RCM Blitz™. The author of Reliability Centered Maintenance using RCM Blitz™ and Clean, Green and Reliable a best-selling book on how to reduce energy consumption in manufacturing plants through equipment reliability. Doug has published over 100 articles on Maintenance & Reliability and has been a featured Speaker as well as Keynote Speaker at a countless number of conferences around the world. 585-329-7040

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

About Doug Plucknette

Doug Plucknette joined Allied Reliability Group as RCM Discipline Leader in 2007. As the founder of RCM Blitz® and author of the book Reliability Centered Maintenance using RCM Blitz®, he has provided reliability training and services to numerous companies around the world, large and small, including such Fortune 500 companies as Cargill, Whirlpool, Honda, Coors Brewing, Energizer, Corning, Invista, and Newmont Mining.

« What Happened?
Interview with Adrian Messer, Manager of US Operations for UE Systems »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RCM Blitz® series
by Doug Plucknette

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy