Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Life testing and accelerated life testing (ALT)

Articles tagged Life testing and accelerated life testing (ALT)

An experiment conducted to ascertain the time-to-failure characteristics of an item attributable to a specific failure mechanism. ALT shortens the time to failure by using more stressful conditions or higher use rates.

by Fred Schenkelberg 22 Comments

Temperature & Humidity Accelerated Life Testing

Temperature & Humidity Accelerated Life Testing

Peck’s Relationship

High temperature & humidity is a common test condition. For specific failure mechanisms, there are models available (or you can create a model) to determine the translation from test to use conditions.

These acceleration models generally only apply to one specific failure mechanisms and do not apply to a system level estimate of life. If the failure mechanism is the dominant failure mechanism for the product, then an ALT exploring just that mechanisms would provide a life estimate.

Peck’s relationship is an acceleration model for the effect of humidity on the metallization elements of integrated circuits within plastic enclosures (typically an epoxy over molding).  [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg Leave a Comment

Time Compression Accelerated Life Testing

Time Compression Accelerated Life Testing

The Easy One

The easiest ALT is one that you operate an item more often then operated by the customer. Removing spans of time the item is not being bent, moved, heated, etc allows you to use time compression.

For example, a home kitchen toaster may be used for a few cycles during breakfast time in your home. In the lab, we can avoid having to wait the day of idle time and just make toast more often than just at breakfast to accelerate the operation of a toaster.

Time compression ALT is also easy to understand and describe the acceleration factor to cover the ALT results to field use conditions. Let’s explore a simple example, work out the acceleration factor and how to interpret a set of ALT results. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 7 Comments

4 Different Types of Reliability Testing

4 Different Types of Reliability Testing

Getting the Right Information from Your Reliability Testing

You cannot test in reliability any more than you can test in quality. Often reliability testing is done though, and knowing the range of testing approaches and their associated results will help you get the most information from each test conducted.

Let’s explore the types of testing that generate information useful as you develop a reliable product. There are 4 different types of reliability testing:

  1. Discovery
  2. Life
  3. Environmental
  4. Regulatory

Within each type there are many variations to the testing details and the specific results generated. Understanding the questions each type of testing has the capability to resolve is a good first step to implementing the right set of tests for your project. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Environmental testing, Highly Accelerated Life Testing (HALT), Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 9 Comments

Introduction to Thermal Cycling Life Testing

Introduction to Thermal Cycling Life Testing

Materials expand or contract with temperature change. Water expands as it freezes, whereas steel contracts as it cools.

This motion can limit the life of your system.

Materials and mechanical engineers include the expected motion into their designs, well the better engineers do.

Even centuries ago, craftsmen used expansion slots or features when attaching wooden table tops to their frames.

The motion due to temperature change will occur and has the potential to create immense strain within your product. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 8 Comments

Introduction to High-Temperature Life Testing

Introduction to High-Temperature Life Testing

A common reliability test involves ‘baking’ a few units.

Various standards list temperature, duration, and sample size requirements.

When the units survive the test, meaning there are no failures, what does that mean?

How do you interpret a system or component life test using high temperature?

Do the results suggest your product is reliable? Maybe it is maybe it isn’t.

Let’s examine one way to design and interpret high-temperature testing. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT), Physics of Failure (PoF)

by Fred Schenkelberg Leave a Comment

Life Testing Starting Point

Life Testing Starting Point

Reliability or life testing involves estimating the expected durability over time of an item.

This may be an entire system, a product, or an individual component. We may also focus on an element of a component, such has a material property.

At the end of the testing, we want to say something meaningful about the expected performance over time. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 2 Comments

Mechanical Systems Reliability Testing

Mechanical Systems Reliability Testing

Mechanical systems wear out and fail eventually. The ability of a structure to support a load, move through the specified range of motion, or spin degrades with use and time. Even our joints eventually wear out.

Accelerated life testing (ALT) has plenty of literature concerning the failure mechanisms unique to electronic components and materials. This is partially due to the limited number of unique electronic components compared to the often custom mechanical designs. ALT also has value as it provides information about a system’s reliability performance in the future.

Let’s explore an example of mechanical reliability testing (an ALT)  in order to outline a basic approach to ALT design and analysis. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 22 Comments

Norris-Landzberg Solder Joint Fatigue

Norris-Landzberg Solder Joint Fatigue

Before Norris-Landzberg’s study there was the work of Coffin and Mason.

Coffin-Manson

One way to approach accelerated life testing is to use a model for the expected dominant failure mechanism. One such model is for solder joint low-cycle fatigue originally published by Coffin (1954) and Manson (1953), independently.

 

Norris-Landzberg

Norris and Landzberg proposed the plastic strain range is proportional to the thermal range of the cyclic loading (ΔT). They also modified the equation to account for effects of thermal cycling frequency (f) and the maximum temperature( T). They and other than empirically fit the parameters for the equation. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 13 Comments

Accelerated Life Testing

Accelerated Life Testing

A form of testing that reduces the time till results are known, ALT provides a means to estimate the failure rate over time of a product without resorting to normal use conditions and the associated duration.

For example, solar photovoltaic cells should operate for 25 years without failure. The product development time is less than a year for a new panel and the team wants to estimate the reliability of the cells over the 25-year duration. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 3 Comments

ALT Value

ALT Value

Here is an example of how to determine the future value of a specific reliability task. Many of us face the challenge of how to justify spending product development resources to provide insights and information to the rest of the team. Accelerated life testing (ALT) is particularly difficult: It is time consuming, expensive, and at times statistically complex. Having a clear method to estimate the value serves your career and the organization well, as both benefit from the right investments.

[Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Life testing and accelerated life testing (ALT), Value

by Fred Schenkelberg 11 Comments

ALT and HALT

ALT and HALT

The other day I got a question about the difference between ALT and HALT. There was some confusion probably because of the similar words in the acronym. ALT is Accelerated Life Test, and HALT is Highly Accelerated Life Test. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Highly Accelerated Life Testing (HALT), Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 5 Comments

Life Testing Question

Life Testing Question

Hi Fred,

I would take this opportunity to ask the reliability guru about bathtub curve for hardware reliability. I am running 27 units for life test for a million cycles around 555 hours. I have one failure at 300,000 cycles, and the rest of the units are running fine. Would this be classified as an early life failure? Also, how do I make a determination of when the early life failure time interval ends and constant failure rate starts in this example based on failure rate of remaining units? Thanks. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Failure mechanisms, Life testing and accelerated life testing (ALT)

by Fred Schenkelberg Leave a Comment

Extended Bogey Testing

Extended Bogey Testing

Reaching for a goal may include taking some risks. In reliability testing, we are often limited by the number of samples available for testing. And, in the case where time is available or the acceleration factor is high we can take advantage of testing longer. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT), Sample size

  • « Previous Page
  • 1
  • 2

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

The Accendo Reliablity logo of a sun face in circuit

Please login to have full access.




Lost Password? Click here to have it emailed to you.

Not already a member? It's free and takes only a moment to create an account with your email only.

Join

Your membership brings you all these free resources:

  • Live, monthly reliability webinars & recordings
  • eBooks: Finding Value and Reliability Maturity
  • How To articles & insights
  • Podcasts & additional information within podcast show notes
  • Podcast suggestion box to send us a question or topic for a future episode
  • Course (some with a fee)
  • Largest reliability events calendar
  • Course on a range of topics - coming soon
  • Master reliability classes - coming soon
  • Basic tutorial articles - coming soon
  • With more in the works just for members
Speaking of Reliability podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Dare to Know podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Accendo Reliability Webinar Series podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy