Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / on Product Reliability / Apex Ridge / Supplier’s Reliability Responsibility

by Adam Bahret Leave a Comment

Supplier’s Reliability Responsibility

Supplier’s Reliability Responsibility

We, as developers, create designs that we call “our own.”  Rarely are the materials for our in-house manufacturing process raw steel, rubber, and glass, like Henry Ford had feed into the Ford factory in 1930. Our manufacturing process receives a mix of materials and fully functional sub assemblies from other technology companies. It’s unlikely the PCB electronic components, bearings, motors, gears, drivetrains, sensors, power supplies, harnesses are ours. Why would you design any of these with so many options available made by specialists?  This results in us having little input or control in the development and demonstrated reliability of our entire product.

After having spent significant resource on measuring and improving reliability on our portion we then send the product off to production knowing only part of the story.  To address this we could fully evaluate the supplied assemblies and components we source.  This does negate some of the value of using supplier components because now we are investing significant resource in the qualification, and likely development, of their products.

The answer is to have teared levels of of DfR engagement with suppliers.  These are the levels I believe work.

  1. The supplier has done a full DfR program including statistical reliability statements based in test programs.  You as the customer are using the product per their specifications which ensure the test results and reliability statements are valid.  This is the most clean cut scenario.  It is important that your team invest in acquiring the suppliers reports and data on the product.  This information is then incorporated into your development program documentation along side your in-house reports.
  2. The supplier has done DfR and a reliability testing program, but the use-case and environmental conditions do not match your application.   The solution is qualification testing in-house or at the supplier using your product use-case and environmental specifications. In many cases the supplier yields benefit as well with this engagement. They will have qualified their product to higher, or my diverse, conditions that potentially increases their customer base and market value.
  3. The supplier has not done any DfR practices in the development process.  There are two paths for this scenario.  The first is to investigate if their is a supplier of an equivalent product that does do DfR in the product development process.  If this is not the case and your current supplier has a proprietary/cutting edge technology then a path of cooperative engagement may be best.  This often includes the supplier operating like an extension of your reliability and design team.  You as the customer may pay the supplier directly as compensation for their investment in creating and executing a reliability program.  The arrangement may be that your investment is non-recoverable engineering cost.  Alternatively it may be that you have exclusive rights to the newly qualified and improved product for a period of time.

What is important is the clear mandate that your team owns the reliability of the entire product regardless of percentage of sourced technology.

-Adam

Filed Under: Apex Ridge, Articles, on Product Reliability

About Adam Bahret

I am a Reliability engineer with over 20 years of experience in mechanical and electrical systems in many industries. I founded Apex Ridge Reliability as a firm to assist technology companies with the critical reliability steps in their product development programs and organizational culture.

« Pets on Planes
Receiving Feedback Well »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Adam Bahret
in the Apex Ridge series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy