Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Supplier Reliability Program Maturity

by Fred Schenkelberg Leave a Comment

Supplier Reliability Program Maturity

Supplier Reliability Program Maturity

It was late Friday afternoon and the phone rang. Which is rarely a good thing.

There seems to a significant spike in field failures due to one component. The initial failure analysis work reveals the issue started with a batch of parts received about two months ago and the flaw continues to appear in subsequent batches.

Turns out that supplier altered a few steps in the assembly process, which they didn’t suspect would cause an increase in field problems for anyone.

Now is not the time to learn about the supplier’s reliability program. We need to solve the problem. If only the supplier could have prevented this issue from happening.

Reliability Maturity

The way an organization addresses reliability is generally a part of the culture. It is how they make decisions. What information is or is not included when deciding on material selection, process changes, or establishing specifications? Do these decisions include the impact of reliability performance?

A simple way to describe the maturity is reactive or proactive. A reactive reliability program only addresses issues when a problem occurs. A customer complains: we work overtime to implement a fix. A reliability test reveals a new failure mechanism: we delay the launch till we can find a solution. The reactive culture may include the celebration of the hero that finds the solution quickly and saves the day.

Well, what if there were no problems that required saving the day? The other culture is proactive. They work to identify issues early and resolve them before the phone rings with a customer complaint. There isn’t any heroics, as it’s just part of the day’s work — create reliability products.

Which supplier would you want to work with? The one that only responds to complaints or the one that works with you to identify and mitigate potential problems?

Maturity Assessment

When creating a new product or selecting equipment for a new line, we have to work with suppliers and vendors. In some cases, we just select a suitable part from a catalog and there really isn’t any need for an assessment. If the supplied part doesn’t work in our design, we have other options.

Yet when we need a custom part, or there is craft involved for a critical part, or it’s a new technology that provides a unique solution and brings risks, we should understand the capabilities and culture concerning reliability. The discussion will often start on technology topics. The discussion often moves to delivery and other necessary elements of a transaction. In the mix, we will likely talk about reliability.

Move beyond just the quick check on reliability, such as asking, “Is this part reliable?” or “What is the MTBF?” Instead, ask about what failure mechanisms to expect in our application and what evidence do they have to support the response? How can we estimate the failure rate given our use conditions? And similar questions.

Ask about how they make decisions and what role reliability plays in those decisions? How do they characterize their component’s reliability and how clear and useful are the results?

If they respond that they have world class customer support and can solve any problem quickly — they are just a good fire department.

If they provide solid research and physics of failure models, they may well have a proactive reliability program. They are likely to identify and solve potential issues before they occur.

Of course, there are systematic ways to assess reliability maturity and I discuss a couple approaches with details on how to improve your own program. See the short book Reliability Maturity: Understand and Improve Your Reliability Engineering Program for a full treatment of reliability program assessments. It also includes specific steps to improve your reliability maturity. You can use this same information to understand the maturity of your suppliers.

May you always work with mature reliability programs. How do you best tell which supplier has a solid reliability program? Let us know in the comments section.


*Accendo Reliability participates in the Amazon Services LLC Associates Program. This affiliate advertising program provides a way for sites to earn a commission on links to Amazon. In short, this means when you buy something on Amazon after following a link from this site, we get a small percentage of its price. This helps support Accendo Reliability by offsetting a portion of the cost to maintain the site. And, your support is much appreciated.

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Reliability maturity assessment, Supplier reliability

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Confidence Interval for Variance
Confidence Intervals for MTBF »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy