Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Stepping Stones in the Lean Journey

by Greg Hutchins Leave a Comment

Stepping Stones in the Lean Journey

Stepping Stones in the Lean Journey

Guest Post by Joseph Paris (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

As very young children, we had an instinctive need to be very close to our parents – feeling a great deal of anxiety, even a sense of abandonment, if they were not within our sight.  As we grew older – and whether it was geographically, intellectually, or psychologically – we would become more comfortable with greater distances from what we felt were our basic truths, but almost always as stepping stones and rarely great leaps. 

Think of early commanders of sailing ships always keeping sight of land until traveling ever greater distances was more predictable because of maps and navigation techniques and tools.

From the time Humans learned to sharpen stones to help with the hunt and the chores then gaining the wisdom to attach them to sticks to improve their effectiveness in the hunt, to harnessing the wind and eventually the atom to leverage the energies contained therein, we have been seeking ways of improving our lives.  The one common discipline that runs through all of these stepping-stones of advancement is the notion of Continuous Improvement – the increase of velocity and predictability with less human effort.

As it is with the notion of Lean which, it can be argued, started with Henry Ford and the assembly line and was leveraged on a mass industrial scale during World War II.

But after World War II, there was a divergence in the way companies were run in the West as compared to the East which was largely based on the cultural differences in the structure of the social fabric.  In the West, the relationship between employer and employee was largely one of command and control – about the self.  Whereas in the East, this relationship was inclined to be more collaborative and about the community.  This difference meant that the ideas of how a modern business might operate – in an increasingly global marketplace – progressed faster in the East than in the West.

Just as the Central Planning of nations that practiced Communism proved inferior to the Distributed Planning of nations that practiced Capitalism; the practice of Command and Control in business proved inferior to those nations who were Collaborative.

So it is with the stepping-stones of the journey that is Lean.  The real question, and challenge, is whether Lean is an inclusive discipline or an exclusive discipline?

For instance, do those that embrace Six-Sigma as a means to Continuous Improvement run contraire to the aspirations that is Lean?  How about those who are disciples of the Theory of Constraints?  Are PDCA, DMAIC, and OODA incompatible with one another?  How about you, personally?  Do you ever find yourself arguing the merits of one approach or set of tools versus the other?  Is it because you are correct or is it because you like to stay close to your parents as you did when you were a child – because it’s comfortable?  What if nobody was right or wrong – yet everyone was right and wrong?

We talk about “creating a pull” in the operations of our business.  What if we tried to “create a pull” when it came to opportunities for improvement – with the nature of the opportunity creating the pull on the various tools, approaches, and “isms” necessary to realize the opportunity without prejudice?

After all, if Lean is about improvement, then as it exists today must change for tomorrow as we move forward onto the next stepping-stone.

by Joseph Paris

Paris is the Founder and Chairman of the XONITEK Group of Companies; an international management consultancy firm specializing in all disciplines related to Operational Excellence, the continuous and deliberate improvement of company performance AND the circumstances of those who work there – to pursue “Operational Excellence by Design” and not by coincidence.

He is also the Founder of the Operational Excellence Society, with hundreds of members and several Chapters located around the world, as well as the Owner of the Operational Excellence Group on Linked-In, with over 60,000 members. Connect with him on LinkedIn or find out more about him here: www.JosephParis.me/card

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Discussing the Controversial Subject of FMEA Prepopulation
People Process and Tools Approach »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy