Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Statistical Confidence

by Fred Schenkelberg 4 Comments

Statistical Confidence

Statistical Confidence

An error that I see on occasion is the use of statistical confidence with a goal or target value. For example, we want 95% reliability at five years with 90% confidence. What does that mean?

Statistical confidence is and only should be used with statements about a sample and the calculated statistic.

First, let’s consider a couple of terms.

Statistic A numerical data value taken from a sample that may be used ot make an inference about a population.

Parameter The true population value, often unknown, estimated by a statistic. A parameter is a numerical value describing some characteristic of a population or process.

Population The complete set.

Sample A portion or subset of a population.

Random Sample A subset of a population selected where every item in the population has an equal chance to be selected into the sample.

Let’s say we have a population, and we are interested in the mean (average) of that population. We select a sample (at random if at all possible) and measure a value, like height or weight or resistance, or whatever is of interest, for each selected item in the sample.

We calculate the mean of the sample by summing the sample values and dividing by the number of items in the sample.

Because we are only using a subset of the population it is possible the sample items are from one part of the population, say the tall part only. It may not be likely, yet it is possible to have selected samples that do not represent the range of values in the population.

It is this possibility that the sample statistic expected to represent the population parameter doesn’t actually even come close is the notion of statistical confidence. In a positive manner, we say there is a 95% confidence that the true unknown population parameter falls within a range of values, also called the confidence interval or bounds. That means there is a 5% chance that the actual and unknown population parameter is outside that range. In other words, we are 95% confident that the sample is ‘this’ close to the actual value.

For continuous data and large samples, we can use the normal distribution to estimate the confidence interval.
$$ \large\displaystyle \mu =\bar{x}\pm {{Z}_{{}^{\alpha }\!\!\diagup\!\!{}_{2}\;}}\frac{\sigma }{\sqrt{n}}$$

Where,

  • μ is the population mean (parameter)
  • x̄ is the mean statistic
  • σ is the standard deviation of the population (a parameter)
  • n is the number of items in the sample
  • Zα/2 is the normal distribution value for a desired confidence level

Now an example. Given the average (mean statistic) of 100 samples is 18 with a population standard deviation (parameter) of 6. Calculate the 95% confidence interval for the population mean, μ.

$$ \large\displaystyle \mu =18\pm 1.96\frac{6}{\sqrt{100}}=1.176$$

This means there is a 95% chance that the true and unknown population mean is within 1.176 around the sample mean of 18. And, there is a 5% chance that is outside that range. Unless we determine the population mean (measure everything in the population), we won’t know.

For fun, consider we are willing to take more risk of the sample not representing the population. The same sample just changes the confidence. Let’s go from 95% to 90% and we find
$$ \large\displaystyle \mu =18\pm 1.645\frac{6}{\sqrt{100}}=0.987$$
Which has a smaller range. Interesting. Same data, more risk, smaller confidence range. In other words, by accepting more risk, we are saying there is now a greater chance that the true unknown parameter falls outside the range described by the confidence interval. The true value doesn’t change; the sample statistic doesn’t change.


Related:

Statistical Terms (article)

Confidence Interval for Variance (article)

Three considerations for sample size (article)

 

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Confidence interval or bound, Normal distribution

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« MTBF and preventative maintenance
Mann Reverse Arrangement Test »

Comments

  1. Pete edwards says

    August 12, 2015 at 6:31 PM

    Interesting page on confidence intervals, liked it. Would be a better page if the damn pop up in the corner inviting me to follow fred would go Away so I could read the bloody page!
    Oh, and I nearly forgot…there is no way to report this to the page authors…so they don’t know they made their own website practically useless….hows the confidence intereval now?

    Oher than that…the web page is much better than the CRE exam prep book. This page actually has definitions on the symbols used in the math…excellent!

    Reply
    • Fred Schenkelberg says

      August 12, 2015 at 9:28 PM

      Hi Pete,

      You are right, there isn’t a contact link or form on the site – I will have to fix that directly.

      And the pop up – the site is hosted on a free wordpress.com account and the folks at wordpress insert ads on occasion and the popup is outside my control. Thanks for letting know and I’ll query about a way to minimize the intrusion.

      And, you may find it useful, that I’m working on moving the CRE preparation material to a new site, http://www.accendoreliability.com in a month or two, if all goes well. I’ll have full control of the site – and promise, no popups.

      The new site will have webinars, podcasts and other reliability engineering materials include a couple of eBooks. My plan is to consolidate a few projects into one site, plus expand it to include courses and more books. Please watch for launch announcements soon.

      Cheers,

      Fred
      fms@fmsreliability.com

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy