Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Simplified Project Management (Part 1)

by Robert Allen Leave a Comment

Simplified Project Management (Part 1)

Simplified Project Management (Part 1)

Organizations often accumulate a list of desirable projects, however, may not have project management bandwidth to filter or manage them effectively.

While project management is a respected discipline, the Project Management Institute Body of Knowledge (PMBOK) has swollen to several hundred pages.  This level of detail and complexity makes it difficult to absorb and apply for ‘informal’ project managers.

With this in mind, project management can be effectively taught and applied using the following (simplified) phases and review gates:

Let’s review these phases and gates and the corresponding review criteria:

Define

  • What is the desired outcome?
  • Is it a desirable project?
  • Who are the team members and stakeholders?
  • What is the project scope?
  • What will the team do? (initial deliverables, high level actions)

Definition Gate 0 – review and approve the opportunity before further definition begins.

Definition Gate 1 – review and approve the project detailed definition & scope.  Ensure the team members are aligned and committed to a successful project.

Plan

  • How will the team perform the project?
  • What will the team do? (detailed level including deliverables, actions,  & milestones)
  • How long will it take?
  • What are the risks?
  • How will the team communicate project status to stakeholders?

Planning Gate 2 – estimates of cost (resources), scope and schedule is understood and acceptable to proceed with the project.  Ensure project execution will proceed based on a solid plan. 

(Note:  As evidenced by the above phases, a fundamentally solid plan is emphasized to ensure successful projects.)

Execute

  • How are we executing vs. the plan?
  • What are the changes?
  • Is the team effectively communicating project status to stakeholders?

Execution Gate 3 – ensure project execution & implementation of deliverables/actions.  Interim reviews should take place before the team’s final execution phase exit (gate) review.  

Close

  • Are we done?
  • How did we do? 

Project Close Gate 4 – ensure the project is complete and original objectives were achieved.  (Gate 4 may be combined with the final Gate 3 review and approval.)

With the above questions we can see the critical thinking to ensure “who, what, how, when”, etc and to ensure good project quality.  We’re also thinking in terms of the project management triple constraints (scope, resources and schedule).  In the part 2 we’ll discuss some tools that enable this simplified project management process.

 

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: Waterfall phase/gate process

About Robert Allen

Robert Allen has over 25 years of professional experience in the areas of product development, process improvement and project management. Rob was a key contributor to numerous deployments of lean sigma and project management organizations, most notably with Honeywell and TE Connectivity. Included in Rob’s experience are multiple certifications and over 25 years of practice in the development, teaching, execution, and leadership of product lifecycle, lean product development, DFSS, lean six sigma, project management, systems engineering and supply chain.

« SPC Average and Range Charts
Validating Business Continuity Plans Using Failure Point Exercise Methodology »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Rob Allen
in the Product Development and Process Improvement series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Join PD&PI

[display_form id=369] Your email is safe and the opt-in here provides your permission to send messages concerning the PD&PI article list plus special announcements. Privacy Policy

Recent Posts

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy