Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Short Term Reliability Focus Challenge

by Kevin Stewart 1 Comment

Short Term Reliability Focus Challenge

Short Term Reliability Focus Challenge
I read an interesting article from Heinz P. Bloch entitled “6 Successful Strategies for the Not So New Challenges of Today”, which is available at Reliability Web.  Heinz has been around for many years, and I suspect that his readers have heard him speak or read most of his articles.  In my opinion, his insights have always been spot on and based on time-tested blocking-and-tackling, using simple techniques.  In the article, he started out with the following:

Bloch’s Thought

“The challenges facing any industry sector today are the same that existed decades ago and delineated at many conferences and meetings. They are still the same challenges because acting on preexisting ones would have added to the workload.
It was decided, in the intervening years, to continue the chase after the magic bullet and pay-hefty-fees- for-consultant conceived generalities and, occasionally, more automated predictive maintenance (PdM) devices. In other words, the lessons learned and explained decades ago were often disregarded by managers whose focus was short-range.
The focus today is even more short-range than it was 20 or 25 years ago……..”.

Short Term Focus

What caught my eye was in the second paragraph “In other words, the lessons learned and explained decades ago were often disregarded by managers whose focus was short-range.”
I am a true believer that many managers have a short-range focus.  Now, if you are a manager please don’t stop reading!  I didn’t say that was bad, just a fact.  Their short-range focus is driven by organizational structure and rewards system, and they have little choice in their focus range.  If this is true, reliability personnel now have the difficulty of dealing with short-term and long-term goals.

Why Short term focus?

Most of the managers I knew had performance objectives that were for next year, not 10 years from now but next year.  Another thing I noticed was that “movers” were very seldom at the same job for more than 2 – 3 years.  This drives them to have shorter term focus to accomplish their goals, and I must admit, if I were a mover, I’d do the same thing.  So, the issue for reliability is to accomplish short-term results while keeping a long-term focus.  This can be difficult in any environment, especially one that is reactive.  I have mentioned before that a reliability initiative takes 10 man-years of time.  So, it isn’t difficult to imagine a 5-year reliability project started under one manager, and 2 years into it, that manager gets promoted and a new one comes in all full of great ideas and energy.  Unfortunately, the mangers ideas don’t coincide with current accepted reliability practices.  They don’t believe the current best practices for maintenance are correct and want to go in a new direction.  You are limited in your choices.  How can we deal with this?
In one of my other blogs, I mentioned that I have said many times while at Alcoa “It ticks me off that I have a reliability job.” This was about the fact that Alcoa was 100 years old.  I could not believe that we had not already resolved this “maintenance thing” and were the best in the world at it.  Why hadn’t we developed the maintenance process and already resolved all the issues?  It turns out that even though Alcoa was 100 years old, they were thinking in 5-year increments with no thought towards building on the previous increment.

An Example

As an example of this, I will relate that while researching planning and scheduling for my facility, I ran across someone in another division who offered, and did, send me a manual on the process that had been developed at their facility.  I was shocked because it laid out a plan that rivaled anything that was available at the time.  When I called back and asked where it came from, he explained that they had been doing planning for some time, but a new manager came in and decided that they didn’t need the overhead and eliminated the group.
Why would someone be allowed to make a major shift in an organizational structure without some sort of question or discussion?  In this case, they had no long term operational vision nor data to verify the cost savings.  There was no change-management system to help them review the ramifications of this decision, and as Heinz pointed out, they most likely were in the uninformed class of people.

Lessons Learned

I’ve heard similar stories from other contacts at other companies where the same thing happened.  I propose that your company may have some of the same issues.  So, what do we do about this?  You will not change the short-term focus of the managers, so you must make some changes in the way you approach your work.  You will need to:

Provide relentless feedback showing short-term success in terms of dollars, while keeping a long-term focus for the reliability effort

Work with management at the highest level to incorporate a long-term vision for how maintenance will be done

Establish some type of change-management system that will insure major changes to a departmental procedural system must be looked at before being changed

 

Filed Under: Articles, on Tools & Techniques, Reliability Reflections

About Kevin Stewart

Welcome to Accendo Reliability – join us and learn the art and craft of reliability engineering

I am an experienced educator and maintenance/reliability professional with 38 years of practical work experience in a variety of roles for ALCOA Primary Metals Group and ARMS Reliability.

« 4 Differences Between Leaders & Managers
A video of the great grandchild of the product of the first HALT »

Comments

  1. James Valente says

    September 18, 2017 at 8:50 PM

    Very thoughtful post on goals. It will be very much helpful.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Kevin Stewart
in the Reliability Reflections series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy