Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The Russian Concorde … and why you haven’t heard of it

by Christopher Jackson Leave a Comment

The Russian Concorde … and why you haven’t heard of it

The Russian Concorde … and why you haven’t heard of it

I was recently talking with my colleague Fred Schenkelberg from FMS Reliability (this conversation can be heard here), about a plane that he had never heard of. Most of the world hasn’t heard of it. And there is a reason you probably haven’t either. The plane in question is a case study on how to design something to fail.

The plane I am talking about is the Tupolev Tu-144 … but it is better known as the Russian Concorde. The early 1960s was saw the phrenetic start to the Cold War. The Soviet government announced it would be developing a supersonic passenger plane in response to the Anglo-French Concorde. And here is the first clue as to why the Tu-144 would never be a commercial success: the over-arching goal was to create a ‘geopolitical statement’ and not to produce aircraft to enter a competitive marketplace.

A basic internet search can identify many pictures and photographs of the Tu-144. And it is easy to see why it is referred to as the ‘Russian Concorde.’ Both the Tu-144 and Anglo-French Concorde look similar. Both aircraft have delta wings and long ‘pointy’ noses. Both noses pivoted down at takeoff and landing. But the differences between the two are within the fuselage. And these differences are substantial.

One of the many problems of ‘geopolitical statements’ is ‘geopolitical constraints.’ Soviet designers were not able to leverage expertise beyond the Soviet Union and its allies. Where the British and French Concorde design team were able to freely collaborate and use (for example) technology developed in the United States, the Tu-144 design team could not. They had to develop supersonic engines from scratch and in isolation. The Kolesov RD-36-51A engine they created was not efficient – one of the many prices that had to be paid to keep pace with the better resourced Anglo-French Concorde. The Tu-144 also needed an afterburner, with its Kuznetsov NK-144A turbofan (used during takeoff and maintain surge margin) was also one of the least efficient of its kind. The Tu-144’s theoretical maximum range was 5 330 km. The Anglo-French Concorde’s actual range was 6 470 km.

But inefficiency was not the main issue with the Tu-144. The Tu-144S (the main commercial model) flew a total of 102 very short flights before the program was finally cancelled in 1983. They logged a meagre total of 181 flying hours. But it experienced at least 226 failures – 80 during flight. The most spectacular failure was at the 1973 Paris Air Show. To be clear, there is still some speculation about what caused the crash. A French Mirage fighter was flying overhead, potentially trying to photograph the Tu-144. The Tu-144 either stalled, its pilots tried to outdo the Anglo-French Concorde which had just flown, or its pilots were startled by seeing the Mirage above their cockpit. The next thing that happened was a steep and potentially uncontrolled dive. When the pilots tried to pull out of the dive at full power, the Tu-144 broke up with wreckage falling on nearby houses.

This crash did not halt the program, but it dealt it a significant blow. And the Tu-144 kept failing. The risk of failure was so extreme that the lead designer (Alexei Tupolev) and Soviet vice-ministers had to individually inspect the aircraft before each takeoff. There are stories about pilots stuffing pillows into onboard warning sirens due to the constant state of system failure. Failures included things like cabin decompression through to fuel tank valve failure.

But perhaps the most ‘enlightening’ failure mechanism was fatigue cracking. Fatigue cracks appeared in many of the large Tu-144 parts machined from single large blocks of molded alloys. This manufacturing approach was internally trumpeted as an advanced feature of the Tu-144. But any metallurgist or third year material engineering student will tell you that this is a very, very bad idea.

Why? Molding metal is challenging. It is easier to make sure that there are no impurities in small pieces of metal. It is easier to cool smaller pieces more uniformly to ensure relatively consistent grain size throughout. And another benefit from using many smaller pieces of metal in an aircraft is that a crack in one piece cannot easily spread to a crack in another piece. So you effectively isolate the crack to a small piece.

But if you have a crack in a large piece of metal, it can eventually keep going from one end to the other. And with some of the metal components on the Tu-144 airframe 19 meters long … this is a big problem. And fatigue cracks that were many meters long were routinely observed.

So in 1977, the Tu-144 was pushed into passenger service with Russia’s airline – Aeroflot. This was not a decision supported by the airline – rather a decision forced upon it be the Soviet government. But even the politicians and their representatives tried to mitigate against the aircraft’s unreliability by limiting it to as few a routes and schedules as possible. This was around the same time that a clearly stressed design team made unprecedented requests to the British government for help on the Tu-144 design. The requests were uniformly rejected.

In fact, every significant decision regarding Tu-144 design milestones were geopolitical. The Anglo-French Concorde was scheduled to first fly in March 1969. So the Soviet government decreed that the Tu-144’s maiden flight had to be in 1968. And where the Anglo-French Concorde’s design schedule was delayed several times to resolve certain design issues, no such leeway was given to the Tu-144 design team. And by the time of certification, the Tu-144 had completed less than 800 hours of flight testing, compared to the Anglo-French Concorde’s total of more than 5 000. And while the Anglo-French design team focused solely on the Concorde, the Soviet bureau of designers had to simultaneously focus on the Tu-144, the Tu-154 passenger jet and Tu-22M bomber aircraft.

This is not a new story. There are plenty of examples of designers having to balance the priorities associated with time to market (or service) and reliability. There are also plenty of examples of designers trying to meet multiple competing design goals (or projects) without enough resources. And as one saying goes …

give me an 80 per cent solution now, not a 100 per cent solution when it is too late.

So balancing schedule and reliability (or quality) needs to be an informed one. The Tu-144 wasn’t even an 80 per cent solution. And while the designers knew this, they couldn’t do anything about it. Limiting the routes and schedules is like an ostrich sticking its head in the ground. But the laws of physics apply to everyone and everything equally.

So for anything you might be designing, ask what you are trying to achieve. Or more correctly, ask what your leaders are trying to achieve. If they are exclusively focused on making a geopolitical statement by flying your developmental aircraft in 1968, before your strategic competitor does the same, then that is what the leaders will get. And the Soviet government got this. The Tu-144 was the first commercial airliner to fly faster than Mach 2.0. But the Anglo-French team were not as focused on winning battles of prestige (or at least, not to the same extent). They lost the first race. But that was not the race that mattered.

So make sure you don’t just focus on making something that can work. You need to focus on making something that will work. And if you can’t strike the balance between time to market risks and the physics of failure, then you will lose. Commercially or catastrophically.

 

[display_form id=396]

Filed Under: Articles, on Product Reliability, Reliability in Emerging Technology

About Christopher Jackson

Chris is a reliability engineering teacher ... which means that after working with many organizations to make lasting cultural changes, he is now focusing on developing online, avatar-based courses that will hopefully make the 'complex' art of reliability engineering into a simple, understandable activity that you feel confident of doing (and understanding what you are doing).

« Do You Need Robustness?
Orifice Plate Meter Flow Measurement »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Chris Jackson
in the Reliability in Emerging Technology series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy