Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The Role of Legends in Your Reliability Program

by Fred Schenkelberg 2 Comments

The Role of Legends in Your Reliability Program

The Role of Legends in Your Reliability Program

One of my favorite things to do when visiting a new company, it at lunch or during a break, ask:

“Any major disasters that impacted reliability?”

Typically, there are three stories that start with, “Remember the… “, or, “One time…”

It seems every organization has legendary stories in the organizational memory.

The Pick Roller Story

When I first joined HP as a Design for Manufacturing engineer, the first story I heard was about the pick roller.

This small part is what grabs a sheet of paper from the tray and moves it into the printing pathway.

Apparently, as a means to reduce cost the rubbery bit of the roller was changed from a separate part to being formed directly on the spindle.

This eliminated alignment and attachment steps, thus reduced cost.

What wasn’t obvious to the team prior to the onset of field failures, was the manufacturer of the newly combined spindle and pick roller included a plasticizer within the polymer of the pick roller.

The bad part is the plasticizer blooms to the surface of the roller making it very slick, thus unable to ‘pick’ a sheet of paper.

Nearly all the product testing involved extreme use or conditions all of which did not reveal the issue. It was most accelerated at normal use conditions with relatively infrequent printing – as most people did.

In the lab we would print thousands of sheets a day, effectively removing the bloomed plasticizer as it arrived avoiding the building of a slick coating.

Along with the story was the lesson that I keep in mind to this day, always think through how a change will alter how a product can fail.

Thinking through the assembly process and design change with an FMEA may have altered the team to the potential for the plasticizer bloom issue.

The other lesson that this legend shared was there are many ways a product can fail.

No amount of reliability testing can find all of the potential paths to failure.

The legend’s purpose

The pick roller legend served to remind the organization to consider the impact of design and process changes on product performance.

It was effective because it was memorable.

It was a story, often told as a mystery – what could be causing the pick roller from working, ‘we checked everything’.

Legends or stories provide an organizational memory. They provide a way to pass along the lessons learned.

They also provide a sense of community, as the pick roller story was real, happened here, and affected our customers.

The stories provide a caution or guide that allow us to avoid the same dire fate, or benefit from doing some task or process correctly.

The stories in our organization tend to be effective, more so than a lessons learned database.

Through story, we connect to the events and lesson.

Limits of legends

As I ask for stories, I find there is generally only a few in the organizational memory.

Often only three such stories. Sometimes a couple more.

Maybe this is due to the infrequency of legendary events, or it’s due to our limited capacity to store in our memories more than a few stories.

As new legends enter the organizational memory the older ones fade.

This is unfortunate as the lessons remain valuable if the stories are recalled.

As the story fades the chance the organization will re-learn the lesson increases.

Do you have legendary stories?

If so, tell them often. Keep them fresh.

Maybe we should make a repository of such stories (told without revealing trade or company secrets or violating non-disclosure rules). I’m sure it would be entertaining.

Though not sure the stories from another organization would truly enter your organization’s memory and serve the same purpose as your own legendary stories.

If you have a legend or two and would like to share it, please add to the comments below.

If you find the stories useful, how so? What has a legendary story helped you accomplish or avoid?

Do you have ‘story-time’ in your organization?


Related:

Purpose of a Reliability Program (article)

Success as a Reliability Engineer (article)

Reliability as Part of Every Decision (article)

 

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Lessons learned system

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Economic Considerations
Exam Taking Insights and a Request »

Comments

  1. Bill Meeker says

    October 30, 2016 at 8:29 AM

    Fred:

    I like the story about the pick roller. I also have heard about (and in a few cases was directly involved) in some reliability disasters (as I call them). Some of these were used in the two papers that I coauthored on “Pitfalls of Accelerated Testing” (one in 1998 and another in 2013, after we had seem many more).

    Bill

    Reply
    • Fred Schenkelberg says

      October 31, 2016 at 11:10 AM

      Thanks for the comment Bill. This was a fun article to write.

      The power of stories, especially horror or disaster stories serves an important role in the building of an organization’s culture. While we may not be able to influence which stories are told, we can help improve and keep specific stories alive – in the retelling.

      A great place for such stories is in training and seminars within the organization.

      Cheers,

      Fred

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy