Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Why Risk Management is a Knowledge Cornerstone

by Greg Hutchins Leave a Comment

Why Risk Management is a Knowledge Cornerstone

Why Risk Management is a Knowledge Cornerstone

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The four knowledge cornerstones of project risk management are:

  • Project Management
  • Earned Value Management
  • Risk Management
  • Subcontract Management

Why are these called the four cornerstones? Each cornerstone addresses a primary risk source as shown in Table 1. This article address risk management. The remaining cornerstones will be addressed in separate articles.

Table 1 Knowledge Cornerstones Risk Source

Cornerstone Primary Risk Source
Project Management Known risks (scope; schedule; cost; quality)
Earned Value Management Known and unknown (uncertainty and variations)
Risk Management Unknown risks
Subcontract Management Subcontractor risks

WHAT PROBLEM ARE WE SOLVING IN THIS ARTICLE?

The problem we are solving in this article is providing you with a basic understanding of the risk management process. The definition and explanation of a risk, description of what risk management means, and a discussion of the methods used to identify risks are topics included in this chapter.

WHY IS IT IMPORTANT TO YOU?

Projects typically fail due known and unknown risks. Known risks are addressed primarily by applying effective project management methods and principles as well as EVM. Unknown risks are the uncertainty and variances that surround all projects. It is important for you to understand the risk management process and gain the knowledge and skills to identify risks on your project to mitigate the uncertainties and variances and pave the way for a successful project. Future work will become more projectized. As a result, it behooves you to be adept at-risk mitigation and how it is done.

WHAT IS THE RISK MANAGEMENT PROCESS?

Figure 1 shows the risk management process.  It comprises four basic steps. They are: identify the risks; analyze the risks; risk response; and monitor/control the risks.

Figure 1 Risk Management Process


Risk Identification

Table 2 shows some common techniques for identifying risks.

Table 2 Risk Identification Techniques

Technique Comment
Brainstorming. Group members build on each other’s ideas
Surveys List of questions are developed to seek out risks
Interviews An effective way to determine risk areas
Working groups Good way to analyze an area to surface risks
Documented knowledge Collection of data/ information about a risk area
Historical information Similar to documented knowledge but widely accepted
Engineering templates These templates are intended as general guidance to accomplish a top down assessment of activities.
Work Package (WP) level assessments The most effective technique to identify risks is at the WP level. The WP manager is the most knowledgeable team member to assess the risks for his/her task.

Analyze risks 

There are two basic types of analysis. They are: qualitative and quantitative methods. The qualitative method is more commonly used because, with the exception of mega-projects, there is usually insufficient data to perform a valid quantitative analysis. Table 3 shows an example of qualitative risk levels. The levels are subjectively chosen based on experience and typically approved by the project manager.

Table 3 Qualitative risk levels

Level Probability of Occurrence (%) Impact of Occurrence
High 41-50 Very likely to occur. Has occurred in past projects.
Medium 31-40 Likely. Possible to occur.
Low 10-30 Unlikely to occur.

 Response (Handled)

Once the risks (and opportunities) have been identified, the next step is to determine how they will be handled (or responded to). Risk response (handling) options include:

  • Assume
  • Mitigate
  • Transfer
  • Avoid

Assume

In this case, the risk is acknowledged but no action is taken because the priority is low and it is not possible or cost effective to address it. For example, if one of your key suppliers is located in a flood zone, there is a risk a flood will happen resulting in schedule and cost impact to your    project.

Mitigate

Mitigating a risk is the most common technique primarily due to the fact the other three techniques are not that common.  Mitigation action is taken to reduce the probability of occurrence and impact on a project. There are many ways to mitigate a risk depending on what the risk is. For example, redundancy can be added to a system to increase the reliability and reduce the probability of occurrence.

Transfer

This handling technique involves transferring the risk to another party. For example, fire or flood risks can be transferred to an insurance agency.

Avoid

Avoidance of a risk is when the project team takes actions to eliminate a risk. For example, if one of your major suppliers may go on strike in the middle of the contract, avoiding the risk could be done by splitting the contract between the subject supplier and another supplier.

Control and Monitor

Project risk control and risk monitoring is where you keep track of your risk responses (mitigation plans) performance against the plan usually on a monthly basis. Earned Value Management is a very useful tool to control and monitor risks.

 Summary

Risk management is a knowledge cornerstone of project risk management because it is essential to managing unknown risks. The future of work is based on new technologies such as: Robotics; Artificial Intelligence; and Big data. New technologies bring new unknown risks. Risk management will be more important in future work to manage these risks.

Post Note

I authored a new book entitled ‘Project Risk Management’.  How to manage known and unknown risks is discussed in detail in my book.  The book contains much more detail, examples, and risk stories. It is easy to read and understand. Visit my website https://projectriskmanagement.info/.  It includes a link to Amazon and my book as well as the technical papers I have written over time.

Bio:

Currently John is an author, writer and consultant. He authored a book entitled ‘Project Risk Management. He has written numerous risk papers and articles. He writes a risk column for CERM.

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has extensive experience with commercial and DOD companies. He is a member of PMI (Project Management Institute). John has managed numerous large high technical development programs worth in excessive of $100M. He has extensive subcontract management experience domestically and foreign.  John has held a number of positions over his career including: Director of Programs; Director of Operations; Program Manager; Project Engineer; Engineering Manager; and Design Engineer.  He has experience with: design; manufacturing; test; integration; subcontract management; contracts; project management; risk management; and quality control.  John is a certified six sigma specialist, and certified to level 2 EVM (earned value management

If you want to be a successful project manager, you may want to review the framework and cornerstones in my book. The book is innovative and includes unique knowledge, explanations and examples of the four cornerstones of project risk management. It explains how the four cornerstones are integrated together to effectively manage the known and unknown risks on your project.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Education and Skills – Double Your Returns
Ethos, Pathos & Logos for Reliability »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy