Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Are you on the right track with the right…

by James Reyes-Picknell Leave a Comment

Are you on the right track with the right…

Are you on the right track with the right…

Are we on the right track with the right train? Your job is to improve reliability and you have a plan. It focuses on bad-actors, having the right data, cleaning up some parts data that is known to be causing delays in work execution, a bit of training in reliability methods, and your adding engineers. You are certainly on the right track with your plan and the actions you will take should indeed make some improvement. But are you on the right track?

Why do you want reliability? It’s a key enabler to achieving high asset availability and that in turn helps reduce your overall operating and maintenance costs per unit of output. Your train is on the track and you have one car – reliability. Most trains have many cars – is your train complete? We have two things that might help, our new book, “Basic Reliability Management” and our new online course with the same name, “Basic Reliability Management“.

Great leaders know that their team matters. They need the right people in the right seats. They also know they must be going in the right direction! Are we on the right track with the right train? They know the answer and it is “yes”.

Does your train have the right driver? Reliability initiatives usually reside in a reliability improvement group, or in maintenance, perhaps even in engineering. If it is within maintenance there is a chance that reliability improvements will be implemented if they entail only maintenance activity and if maintenance is actually being performed efficiently. If it lies within engineering (the sort that does not include maintenance), then there is a chance the improvements will be ignored by field staff in maintenance and operations. If the reliability group stands alone, then there is a chance that they will have an impact, but there’s also a chance they won’t. Reliability groups are often seen to be much the same as engineering, albeit on site instead of sitting in a head office somewhere else. All of these groups, who are all naturals to take this on, will struggle to get results, so arguably it doesn’t matter who takes the lead.

Let’s look at the reliability train. We know that “culture trumps everything” and any change will struggle to get past culture – old habits, old processes, old informal hierarchies, influencers who just don’t get it, etc. In established cultures, we have many people who all have egos. Defending the status quo serves the ego and sustains perceived levels of importance, even at the expense of overall improvements. Those egos get in the way – they block individuals and they block organizations. Getting past ego is a big challenge and it requires a shift in thinking, perceptions, and likely in the direction from those who run the organization. Again, are you on the right track with the right train?

Unreliability is a result of flaws in one or more of engineering (design), operating practices, and/or maintenance. Fixing it will require collaboration among those three groups. Culture can be in the way of that collaboration. Maintenance often complains about design and operating practices or operators who don’t know what they are doing. Operators are quick to point fingers at maintenance. Engineers are often oblivious to the other two. What will bring them together?

For certain, an improvement initiative that is solely in the hands of one group will face a big chance of failing. Even if it can achieve some improvement it is likely to be limited.

Companies are organized into operational (functional) groups or silos. In many organizations, those silo walls are thick and have few windows. Considering that your reliability improvements will need action by multiple groups, you need those walls to come down. Someone higher up the organizational food chain needs to be your sponsor – someone who is engaged and involved, not just a senior title who delegates. The boss needs to care.

Imagine you have problems with data and you know that your EAM is difficult to use, people are poorly trained in it and a major change is likely needed to the software to resolve process and usage inhibitors. Maintenance, engineering, and operations on their own won’t be able to make this happen. They will need cooperation and help from information technology and information management. They often reside in their own silo, sometimes under finance where the emphasis will be on making no changes that will cost more. You’re stuck. You need someone senior enough to bring all thee needed players to the table and insist that they work out a solution among their various competing priorities.

I would argue that reliability doesn’t have a high enough profile. Maintenance is really focused on the efficient execution of activities that restore and sustain asset performance. Reliability, if it is getting any real focus at all, is often a sub-set of maintenance. Shouldn’t the focus be on availability with reliability as an enabler, just as efficient maintenance execution is an enabler? We have managers for maintenance and we might have sub-ordinate managers for reliability. But do we ever have a manager for availability with subordinate managers for maintenance and reliability? We tend to focus on the means and not the end. Raising the profile of what we are targeting may just help to get past some of these problems we are facing.

Getting the best results will involve even more – a collaboration among functional areas. That, in turn, will require a higher level sponsor who gets involved, keeps the pressure on and helps to clear away the barriers.

You need a longer train, more cars, and the right driver!

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Linking Risk Assessments to Decision Making
Guide to Maintenance Management Terminology »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy