Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Return on Investment Analysis for Engineering Managers

by Ray Harkins Leave a Comment

Return on Investment Analysis for Engineering Managers

Return on Investment Analysis for Engineering Managers

A commonly encountered fork in the career road for many successful engineers is to a) continue engineering or b) manage others who engineer. To continue engineering is an obvious choice, and an often desired one.

The second path, to manage others, is also desirable but less demanded in the market place as inherently there are fewer engineering managers than there are engineers. And while moving from engineer to engineering manager also sounds like an obvious choice, it is also a stumbling block for many professionals. The skills required to be a competent engineering manager extend far beyond those required to be a competent engineer. These skills include team-building, coaching, project management, communication and others. But the skills required for engineering management that seem least akin to the engineering profession is business finance.

In addition to evaluating the technical merits of various projects, engineering managers must also evaluate the financial merits technically-sound projects competing for the same budget dollars. Large projects such as new equipment installations, building expansions, and product launches are referred to as capital projects. And the process of evaluating the financial value capital projects add to an organization is sometimes referred to as capital justification, or more commonly, return on investment analysis (ROIA).

ROIA is a central component of business finance, and a “must have” for engineering managers. Far more than a “back of the napkin” guesstimate, ROIA begins by building a dynamic model containing best estimates of the initial investments, ongoing expenses, revenues and salvage values over the project’s lifecycle. Each costs and revenue estimation are also tied to a particular project year. For instance, the year a project is launched is referred to as “Year 0” and includes all the initial costs of the equipment, installation, training and related startup expenses.

Each year in the ROI model is populated with these estimates and the total years in the project lifecycle are extended into the future as far as practically possible. A completed table of these estimations looks something like this where the total estimated cash flows are tallied for each year of the project lifecycle:

Once the model is built, a manager can perform a range of analyses to determine the potential impact of the project on the organization. For instance, all of the net annual cash flows can be “rolled up” into today’s dollars—a model output called the Net Present Value, or NPV for short. After all, money earned a year, two years or five years from now is worth less than the same money invested today.

An ROIA model can also be used to perform a sensitivity analysis to test the robustness of the potential returns. By creating various scenarios from the same model at high and low revenue and expense levels, managers can better understand the inherent risks of the project.

Furthermore, a manager can compare and rank a range of potential projects using their NPV’s and determine which projects are most suitable to start right away, and which are better suited for a later start.

For an engineering manager to be effective, s/he must possess at least a fundamental understanding of ROIA. Without it, they’ll resort to guesswork and hunches.

To learn all the essentials of ROIA needed to succeed as an engineering, quality or manufacturing manager, sign up for the online short course titled “Return on Investment Analysis for Manufacturing”. In two short hours, you will learn how to build, use and analyze Excel-based ROI models. Plus, by signing up for the class, you will also receive all the Excel templates used in the class to apply to your projects and organization. Sign up today by clicking these links:

[display_form id=362]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

About Ray Harkins

Ray Harkins is a senior manufacturing professional with over 25 years of experience in manufacturing engineering, quality management, and business analysis.

During his career, he has toured hundreds of manufacturing facilities and worked with leading industry professionals throughout North America and Japan.

« Coronavirus Uncertainty and the Bureaucracy
Safety vs Reliability »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Logo for The Manufacturing Acadamey headshot of RayArticle by Ray Harkins
in the The Manufacturing Academy article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy