Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Who Is Responsible For Reliability? Everyone!

by James Kovacevic Leave a Comment

Who Is Responsible For Reliability? Everyone!

Who Is Responsible For Reliability? Everyone!

Why Your Operators Need To Be Part Of Your Reliability Program

You drive your car (almost) every day, you will immediately notice a new noise, vibration, or feel to the car.  Once you detect this you would report the issue to your mechanic (or if yourself and do the repair), and he would investigate the issue.  The repair would be made and the car returned to you.

This same approach is what should be happening in your plant.  The operators of the plant equipment, operate the equipment every day and know the equipment.  Any changes or variation in the equipment or process would be noticed by them and should be reported to the maintenance department.

Based on this approach that we use every day with our cars, why is it that in many plants the operators do not notify maintenance of changes?  Or the notifications go unused or not acted on?

Who Owns Reliability?

This lack of communication from operators, or the lack of acting on the communication by maintenance indicates that there is not a true understanding of who is responsible for the reliability of the equipment.

Going back to your car.  The mechanic does not call your house and ask how things are going, it is a joint effort to keep your car reliable.  The mechanic may remind you of routine maintenance, but ultimately it is up to you to give up your car for a period of time to perform the routine maintenance.  During the routine maintenance, a mechanic may find an issue and request your approval to repair it.  Reliability of the car is owned by you and the mechanic

The exact same thing should be occurring in your operation.  It is a joint effort on part of the operations group and the engineering group.  Depending on the maturity of the plant, procurement and engineering will also contribute to the reliability of the equipment.  In the end, everyone is responsible for the reliability of the plant and equipment.

It’s Not Just Operations

During a recent visit to a plant, it was observed that the operators submitted a tremendous amount of notifications and they were acted on by maintenance.  However upon a deeper dive into the operation of the plant, it was observed that the maintenance department never submitted a notification.  The mechanics would walk by a pump that was rattling apart and do nothing.

When asked why they did this, the response was “Notifications are operation’s job.”.  So while operations were involved and maintenance acting on their notifications, the reliability of the plant and equipment was not fully owned by everyone.

The same could go with procurement or engineering.  A purchase of bearing or a new piece of equipment that is based solely on price represents reliability is not on everyone’s mind.  If it was, Procurement would look at the specifications and aim to have the best quality bearing to reduce the total cost. Engineering would pay a little more upfront for standardized equipment, automated lubrication systems, etc.

Getting Everyone To Own Reliability

Getting everyone to own reliability is not a simple wave of the hand.  It is extremely difficult to have everyone understand how they affect reliability, let alone guide their actions to maintain or improve reliability.  There are a few things that can be done to start the ownership of reliability.

  • Top Down Leadership is required to make this shift.  It will not be grown from the bottom up.  Reliability needs to be made an organizational priority and goals aligned across functions.
  • Education is required to ensure everyone understands the impact of unreliability on an organization.  Education is also required so that everyone understands how they can impact reliability.  The impact of procurement will be different than engineering, but there is an impact regardless and not is more or less than another.
  • Performance Management is utilized through aligned cross-functional  If these goals are not measured, part of someone’s performance bonus, or acted upon than reliability will not be top of mind for most people.

Introducing Asset Management

The goal of reliability is to reduce the total cost to the business, whether through lost production, labour costs, warranty costs, or material costs.  This is about getting the most value from the plant.  That is the same goal of Asset Management.  The Asset Management (ISO55001) standard is designed to provide guidance to organizations which want to realize maximum value from their plant (or other assets).

If a plant or organization is seeking to realize maximum value from their assets, improve reliability and get everyone on the same page, the Asset Management standard is a great place to start.  It does not mean your organization needs to be certified against the standard but use the principles within.

It is only when everyone takes responsibility for the performance of the plant and equipment that an organization will truly grow and reduce excess costs.

Is everyone in your plant responsible for Reliability?  How did you get everyone to own reliability?  Did you use education, or performance management, or something else?

Remember, to find success, you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
Eruditio, LLC
Where Education Meets Application

Follow @ReliableJames
Follow @EruditioLLC
Follow @HPReliability

 

References:
ISO 55000 – Asset Management Series

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Gluing Plastic Pipes so You Can Trust Them
Understanding how to prioritize risk for corrective actions in an FMEA »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy