Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Reliability Growth Testing

by Fred Schenkelberg 2 Comments

Reliability Growth Testing

Reliability Growth Testing

One approach for reliability improvement is to find the weaknesses or faults, then fix them.

This is best done before shipping to the customer.

You may hear this called the Test, Analyze, and Fix Method (TAAF). Or, you may have heard of it called a Reliability Growth Test program (RGT). Either way, the essence is evaluating prototypes to find specific faults.

These systems generally work when (according to O’Connor in Practical Reliability Engineering) when:

  • All failures are analyzed and improvement action is taken in design or manufacture, as appropriate.
  • All failures are tracked to the root cause.
  • Take corrective action as quickly as possible.

There are many types of TAAF programs. Mil Hdbk 189 Military Handbook, Reliability Growth Management lists 17 possible models. A popular and effective model is the Duane Model.

Duane Model

Originally based on aircraft data analysis by James T. Duane (General Electric), the model of the cumulative failure rate fell close to a straight line when plotted on log-log paper.

This model is useful over the phases of a project during development.

The general formula is

$$ \large\displaystyle \frac{{{\theta }_{c}}}{{{\theta }_{o}}}={{\left( \frac{T}{{{T}_{o}}} \right)}^{\alpha }}$$

Where:

θc = The cumulative mean time between failure (MTBF) at the desired time.
θo = The cumulative MTBF at the beginning of the test period
α = The rate of MTBF growth
T = The desired test time or test time since the beginning of the test
To = The beginning test time

The instantaneous MTBF, θi is calculated given θc and α with

$$ \large\displaystyle {{\theta }_{i}}=\frac{{{\theta }_{c}}}{1-\alpha}$$

The value of α in the Duane model is never above 0.6. O’Connor provides a basic guideline to determine the appropriate value of α to use for project planning.

  • 0.4 to 0.6 A top priority program to eliminate all failure modes. Immediate attention and correction action prevails.
  • 0.3 to 0.4 An above average program on reliability improvement exists. No environmental testing. Action taken on important failure modes only.
  • 0.2 to 0.3 Routine attention is paid to reliability improvement. No environmental testing. Action taken on important failure modes only.
  • 0 to 0.2 A low priority for reliability improvement

Related:

Duane Plot of Cumulative Failures Over Time (article)

Sources of Reliability Data (article)

9 Reliability Growth Patterns for Two Test Phases (article)

 

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Reliability growth and management

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« How to Spot Reliability-Minded Coworkers
3 Steps NRTL Use for Product Safety »

Comments

  1. Sachin says

    March 6, 2014 at 9:40 PM

    thanks Fred!
    following your post for an year now..
    Really some really helpful info Shared.
    -Sachin

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy