Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Reliability from Current Status Data

by Larry George Leave a Comment

Reliability from Current Status Data

Reliability from Current Status Data

A computer company tiger team held a meeting to decide how to fix their laser printer ghosting problem. Bearings seized in the squirrel-cage cooling fan for the fuser bar. The fan bearing was above fuser bar, which baked the bearing. A fix  decision was made, voted on, and accepted. Party time. I asked, “How do you verify the fix?” Boo!

This an example of using current status life data. I checked status every laser printer laser-printer fan in company headquarters: operating or failed? Date of manufacture was encoded in the printer serial number, so I estimated the fan’s age-specific failure rate function, before the fix. Premature wearout was evident. Could I observe repaired or new printers at a later time and test the hypothesis that the problem had been fixed? Yes. 

Current status data arise when study subjects are observed at various ages and the survival time of interest is known only to be either less or greater than the observation time. [Jewell and Kalbfleisch, Zhang et al, Jewell and Van der Laan]. 

Survival analysis of Afghan refugees in Pakistani refugee camps 

The International Rescue Committee (www.IRC.org) surveyed two Afghan refugee camps in Pakistan before and after humanitarian aid.  The objective of the project was to compare “U5” mortality (P[Life £ 5 years]) at “baseline” (2007) and “endline” (2010).

Survey data came from 2007 before and from 2010 after humanitarian aid. I used nonparametric maximum likelihood (Kaplan-Meier), on admissible ages, and least squares to estimate age-specific survival functions (aka reliability function), because some ages at deaths were inadmissible. 

Conclusion: Maximum likelihood and least squares survival function estimates agreed tolerably. The refugees’ U5 estimates were 10% at baseline and 4% at endline. Pakistan population U5 was 8.7% in 2009 (Wikipedia). Refugees’ infant mortality at age one was almost 4% at baseline and endline. Pakistan population infant mortality was 6.7% in 2010 (World Bank). 

Details

The endline U5 estimate’s standard deviation was less than 0.5%. The baseline estimates are for provinces 1, 2, and both. The endline estimates are for province 2 only, because province 1 was inaccessible. “Current status data” were used for both baseline and endline estimates. Ages at deaths also were used for endline estimates. Alternative endline U5 estimates agree.

The current status U5 estimates are proportions, deaths/births. Statisticians will object that the such data is “censored”; i.e., not all live births were five years old at the surveys. Methods indicate that these ratios are U5 estimates despite censoring. 

The current status baseline standard error of U5 estimates are 0.71%, 1.09%, and 0.93%, and the endline standard error estimate is 0.42%. The standard error estimates are SQRT(U5(1-U5)/births). The standard deviation of the endline U5 estimate from ages at deaths is 0.46%. Only 74 ages at deaths were admissible. 

Table 1. Births and deaths, U5 estimates, and their standard error estimates.

Year, Province Births Deaths U5 Std. Error Est.
2007, 1 847 ~95 11.2% 1.09%
2007, 2 1076 ~112 10.4% 0.93%
2007, both 1923 ~208 10.8% 0.71%
2010, 2 Cur. St. 2133 85 4.0% 0.42%
2010,2 Ages 2133 74  4.1% 0.46%

The apparent reduction in U5 appears to be primarily a reduction in deaths after infant mortality in the first year. Table 2 and figure 1 show province 2 estimates of the cumulative distribution of age at death. Province 2 infant mortality by the first month is about the same for both baseline and endline. The difference only becomes apparent after the first month; i.e., endline deaths after infant mortality are fewer in the endline data. Pakistan countrywide infant mortality (1 year) is 6.7%.  

Table 2. Cumulative probability distribution estimates of age at death.(current status)

Age at death, months Baseline (MLE, LSE) Endline (MLE, LSE)
1 4.1%, 2.4% 3.8%, 2.7%
6 7.8%, 7.9% 3.8%, 3.2%
12 8.4%, 9.6% 3.8%, 3.2%
24 10.4%, 10.4% 3.9%, 3.4%
36 10.4%, 10.4% 3.9%, 3.9%

There are two sets of cumulative probability distribution estimates; “MLE” and “LSE” denote maximum likelihood and least squares estimates  They don’t always agree, because methods differ. The more appropriate estimates depend on your objectives, costs, and risks. 

The MLE and LSE cumulative probability distribution estimates agree for ages greater than 3 years, because they were constrained to be less than or equal to the sample proportion U5. That MLE and LSE cumulative probability distribution estimates achieve their upper bounds justifies the U5 ratio estimates in table 1, even though not all births were five years old at the times of the surveys. You can see from figure 1 that most deaths occurred before age two. 

Figure 1. Cumulative probability distribution estimates of age at death 

The endline survey data supported two cumulative probability distribution estimates: one from current status data and one from age-at-death data. The latter is the Kaplan-Meier estimator. There were fewer valid ages at deaths, because some ages at deaths were after the survey. Figure 2 shows these alternative estimators. Neither is right or wrong. The sample uncertainty in the Kaplan-Meier estimator is quantified by Greenwood’s standard deviation estimate. Figure 2 shows that, according to the age-at-death data, infant mortality extends to approximately one year of age. 

Figure 2. Cumulative distribution estimates of ages at deaths from age data

Applications

Simultaneous nonparametric estimation of COVID-19 survival functions conditional on death or on recovery, from case, death, and recovery counts. This is equivalent to reliability estimation by failure mode, without life data. 

Suppose you had only the inventory counts and whether units were good or failed at two or more times? 

Would you like to verify the effects of changes in design or process?  

References

Zhigang Zhang, Jianguo Sun, Liuquan Sun, “Statistical analysis of current status data with informative observation times”, Stat Med, 2005 May 15;24(9):1399-407. doi: 10.1002/sim.2001, Statistical analysis of current status data with informative observation times – PubMed (nih.gov)

Jianguo Sun & John D. Kalbfleisch (1993) The Analysis of Current Status Data on Point Processes, Journal of the American Statistical Association, 88:424, 1449-1454, DOI: 10.1080/01621459.1993.10476432

“Survival Estimation from Current Status Data,” (Afghan U5 and infant mortality in Pakistan refugee camps before and after humanitarian aid) Joint Statist. Meeting, ASA, San Diego, July 2012 (co-author Hsin-Yi (Cindy) Weng)

Nicholas P. Jewell and Mark J. van der Laan. “Current Status Data: Review, Recent Developments and Open Problems”, U.C. Berkeley Division of Biostatistics Working Paper Series, 2002, paper 113

Filed Under: Articles, on Tools & Techniques, Progress in Field Reliability?

About Larry George

UCLA engineer and MBA, UC Berkeley Ph.D. in Industrial Engineering and Operations Research with minor in statistics. I taught for 11+ years, worked for Lawrence Livermore Lab for 11 years, and have worked in the real world solving problems ever since for anyone who asks. Employed by or contracted to Apple Computer, Applied Materials, Abbott Diagnostics, EPRI, Triad Systems (now http://www.epicor.com), and many others. Now working on actuarial forecasting, survival analysis, transient Markov, epidemiology, and their applications: epidemics, randomized clinical trials, availability, risk-based inspection, Statistical Reliability Control, and DoE for risk equity.

« Analyzing the Experiment (Part 3) – Developing the Model
Emerging Stronger from Crisis »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Larry George
in the Progress in Field Reliability? article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy