Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / RCA – Show Me the Money

by Kevin Stewart Leave a Comment

RCA – Show Me the Money

RCA – Show Me the Money

Reliability initiatives are implemented to improve a company’s bottom line, period.  

Root cause analysis is one of the fastest ways I know to achieve this improvement.  My boss used to say “show me the money” because he realized that upper management was driven by ROI (Return on Investment) or ROC (Return on Capital). 

You can argue all you want on whether that is good or bad, but it is the way things are.

With a reliability initiative, this return is generated by reducing costs or improving output, or a combination of both.  This, in turn, is done by improving reliability by eliminating repetitive problems which extend the MTBF of failures or PM requirements, etc..

This allows you to spend less or make more product at a higher margin.

failureDefect elimination is the key

The process of eliminating failures is normally included as part of the overall process of Asset Management, which involves RCM, maintenance planning, scheduling, training and other tools.

I have always found it interesting that problem-solving or Root Cause Analysis is not listed as one of these tools.

This fact that the tool is reactive and not proactive may be the reason.  For another perspective on where and how this fits into the overall plan to improve reliability, you can review the article by Jason Tranter where he talks about improving reliability, and specifically about defect elimination, which is about the 4th paragraph from the end.

It is, without a doubt, in my opinion, the single most cost-effective tool with some of the highest ROI available.

This is not to say that the other tools are not important, or that they shouldn’t be pursued.  I personally was involved in setting up an entire system with all the bells and whistles, and programs at the facility I worked for at Alcoa.

This included planning and scheduling and even running the storeroom for a time.

Cost-effectiveness

Why do I believe it is the single most cost-effective tool?  It is inexpensive and can be implemented very quickly.  An employee can go to a public seminar for less than $2,000.

Even less if it is an onsite class.

From this 2-day class, you come away with the skills to analyze a problem and offer up effective solutions.  Theoretically within a week, you can easily make back the investment in the training.  I know this because I’ve done it and clients confirm it.

A simple example

While at Alcoa I required my students to do a project after the RCA class I taught, and if they didn’t, I threatened to send their plant manager an invoice for the public class cost of $1,595.

At the time my department paid for the materials and my boss sponsored my time so they actually paid $0 for the class.  Since they didn’t want to explain an additional cost to their plant, I had plenty of projects.

One project I remember was an analysis done by a student done the day after the class.

She grabbed a couple of people that attended the same class and did the analysis and proposed an effective solution that very next day.  The solution ended up only costing some maintenance time.  The savings were calculated at $400,000 based on real numbers.

To put it in perspective of potential outside participants, if the class and time to analyze and implement were $5,000 then the ROI would be 8,000% (savings/investment).

Imagine going to your management and telling them you just saved them $400,000 with a $5,000 investment!

Having been involved in the capital side of engineering for a while I know that many times they were ecstatic if the ROI was a whopping 50%!

Most plant management personnel will be extremely happy if you can show them this kind of data and will probably start to take notice of you and perhaps any programs you are trying to implement.

Show them the money.

Filed Under: Articles, on Tools & Techniques, Reliability Reflections

About Kevin Stewart

Welcome to Accendo Reliability – join us and learn the art and craft of reliability engineering

I am an experienced educator and maintenance/reliability professional with 38 years of practical work experience in a variety of roles for ALCOA Primary Metals Group and ARMS Reliability.

« When Smart TV Content Delivery Fails, Who is to Blame?
Annual Apex Ridge Seminar “Balancing Reliability with Product Development Goals” »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Kevin Stewart
in the Reliability Reflections series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy