Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / RACI: The Final Step in the Roles & Responsibilities Process

by James Kovacevic Leave a Comment

RACI: The Final Step in the Roles & Responsibilities Process

RACI: The Final Step in the Roles & Responsibilities Process

Tie all the Roles & Responsibilities Together in an Easy To Use Document

This is the final post in the series on roles & responsibilities and is the final step in ensuring the team is working together.  So far in the series we cover the importance of defining role & responsibilities.  How to determine roles & responsibilities, and the major roles in the maintenance department.  In the last post, we will cover how to tie it all together in a simple, easy to use document.  A RACI.

What is a RACI?

A RACI is a chart that identifies the individuals in a process and identifies who is;

  • Responsible: Who Actually Does It?
  • Accountable: Who Has Authority To Approve Or Disapprove, or Answers for the completeness of the task
  • Consulted: Who Has Needed Input About The Task?
  • Informed: Who Needs To Be Kept Informed About The Task?

When each process is presented in this fashion it is easy to see how is executing each step in the process and how the other roles are involved.

Why a RACI is Important?

A RACI chart is vitally important as it takes all the roles, responsibilities and accountabilities and makes then easy to follow.  The RACI chart breaks out the roles & responsibilities for each individual process, ensuring there is complete visibility to each step in the process. Lastly, it ensures that each process is clearly laid out and everyone knows who they can count on for what.

How to Use a RACI with Roles & Responsibilities

RACI
A Completed RACI Chart

With the roles for a specific process identified, it is now possible to create a RACI chart.

To create the RACI chart, you first list the steps of the process in the left hand column, and list the specific functional roles across the top of the chart.

The chart is then populated with the appropriate RACI.  This is ideally done as a team, after reviewing the process.  This then allows for challenges and builds, to create a sense of ownership within the team.

In the end you can see the steps within the process and who is responsible, accountable, consulted and informed for each step of the process.   This ensures that everyone know what they need to do to make the process work and who is the decision maker.

Review the RACI

Once the chart has been populated, we need to review the chart to ensure it will work for the team, without overloading individuals or creating bottlenecks.

First we review the chart vertically for each functional role;

  • Are there too many R’s for one person?  If one role has a lot of R’s, can they handle the work load?  If not spread the work around.
  • If there are no A’s or R’s can this role be eliminated from the process?  To make the process efficient, we need to remove anyone from the process that is not needed.
  • Are there too many A’s? If an individual has too many A’s a decision bottleneck may exists?

Once the all roles have been reviewed, it is time to review the Step or the Chart horizontally

  • Are there no R’s?  If not, then who will actually perform this step?
  • Is there too many R’s? If everyone is working on the same step, will it be a mad rush, leading to poor outputs?
  • Is there more than one A?  There can only be a single decision maker for each step. If there are 2, determine who would be best informed to make the decision, and who will have to answer for the process failing at that step
  • Are there too many C’s or I’s?  This can lead to extended times to complete the step.  We want to keep people informed and consulted, but do so within reason

The Chart is now complete, and can be shared amongst the team for reference.  It is important to review the chart with the team and ensure everyone is clear.

The last thing to do is to ensure that the chart is kept up-to-date when any process changes are made.

Do you have a RACI for all major processes?  If not, you may be duplicating work, or at a minimum, making the work inefficient.

Remember, to find success, you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
HP RELIABILITY
Solve, Achieve, Sustain
Follow @HPReliability

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Estimating Time to Demonstrate Reliability
FMEA Q and A – System-Level Functions »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series
by James Kovacevic

Never Miss a Weekly Article

[display_form id=14] Your email is safe and the opt-in here provides your permission to send you messages about recently published Maintenance & Reliability articles. Privacy Policy

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy