Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Quality Risk is a Major Reason for Project Failures

by Greg Hutchins 2 Comments

Quality Risk is a Major Reason for Project Failures

Quality Risk is a Major Reason for Project Failures

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

My contention is management many times compromises quality to mitigate budget and cost issues resulting in a major risk to the project.

How to minimize the quality risk on a project is addressed in this paper. The approach to do this is based on my 30 years of project and project risk management experience and knowledge. Let’s start with a story to illustrate my contention.

HUBBLE TELESCOPE STORY

The baseline mirror polishing was based on a new process. NASA thought it was too big of a risk and went with a second source that used the standard polishing process to mitigate it. Well into project, NASA cancelled the standard polishing process company leaving only the new approach. The reason for cancellation was due to budget and schedule issues.

Before launch, the engineers approached management and requested another mirror test to confirm the shape before the telescope was launched into space. Management told the engineers that the project was over budget and behind schedule. Their answer was no. The telescope was launched and went operational but the images were fussy. The mirror shape was incorrect. It took NASA over a year to fix it in outer space at a very significant budget and schedule cost.

The point to this story is management compromised quality because of budget and schedule problems. If they applied effective project risk management, this event would most likely not have happened and the government could have saved millions of dollars.  Question is-how is effective project risk management applied?

FOUR CORNERSTONES OF RISK MANAGEMENT

The cornerstones are listed in Table 1.  Each one addresses a certain category of risks. Together they address virtually all possible risks that may affect the project.

PROJECT MANAGEMENT

Studies have shown that the majority of project failures are due to poor management of the known risks.  The known risks are:

  1. Scope
  2. Schedule
  3. Cost
  4. Quality

In the case of the Hubble Telescope story, schedule and costs were to be the culprits. To mitigate known risks, it is essential to apply excellent project management knowledge, leadership, and methods.

2.   EARNED VALUE MANAGEMENT (EVM)

EVM measures the project progress against the baseline plan. It is a very effective tool for enhancing project management on a project because it identifies poorly performing WPs early for maximum time to identify the problem and resolve it. WPs are color coded to indicate their performance level and provide easy and quick identification. Red means the WP is performing poorly and needs attention. Yellow is caution. Keep an eye on it. Green is good. No need to pay any attention to it unless the color changes.

If you can manage problem WPs to a successful conclusion, then the probability is high that the project will be a success.

3.   RISK MANAGEMENT

Risk management address the unknown risks on a project. These are the uncertainties and variations that surround all projects. Figure 1 shows the risk mitigation process for the unknown risks. Identification and analyze take place during the proposal phase to ensure the budget and schedule to mitigate the risks are included in your proposal before it goes to the customer. Response and monitor/control take place after contract award.

SUBCONTRACT MANAGEMENT

The majority of companies today subcontract out up to 60-70% of their work scope. As a result, the subcontract becomes a major risk to the project.

The two basic actions you can take to mitigate this risk are: (1) carefully select the subcontractor; (2) closely and frequently manage the subcontractor.  Be aware of other risk factors (shown below). Add margin to your proposal to mitigate these risks. Start working with your subcontractors well in advance of the customers request for proposal (RFP) issuance.

Other risk factors:

  1. Insufficient time for subcontractor to prepare a solid proposal
  2. Soft requirements
  3. Late subcontract award
  4. Poor contractual arrangement with subcontractors suppliers

SUMMARY                                                    

I have seen on many projects that I was involved in examples of management compromising quality to mitigate known risk issues.  Do not give management a reason to compromise quality.  Apply effective project risk management knowledge, experience, and methods to enhance the possibility that the known risks on a project will be managed well and major issues avoided.

Quality is not free. It is essential to the success of projects and more importantly to the health of the enterprise.  Keep quality standards high.

Bio:

Currently John is an author, writer and consultant. He authored a book entitled ‘Project Risk Management. It went on sale on Amazon in August 2019. He has presented several Webinars on project risk management to PMI. He writes a weekly column on project risk management for CERN. John also writes monthly blogs for APM. He has conducted a podcast on project risk management.  John has published numerous papers about project risk management on LinkedIn.

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has extensive experience with commercial and DOD companies. He is a member of PMI (Project Management Institute). John has managed numerous large high technical development programs worth in excessive of $100M. He has extensive subcontract management experience domestically and foreign.  John has held a number of positions over his career including: Director of Programs; Director of Operations; Program Manager; Project Engineer; Engineering Manager; and Design Engineer.  He has experience with: design; manufacturing; test; integration; subcontract management; contracts; project management; risk management; and quality control.  John is a certified six sigma specialist, and certified to level 2 EVM (earned value management).https://projectriskmanagement.info/

If you want to be a successful project manager, you may want to review the framework and cornerstones in my book. The book is innovative and includes unique knowledge, explanations and examples of the four cornerstones of project risk management. It explains how the four cornerstones are integrated together to effectively manage the known and unknown risks on your project.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Beware of the Dangers of a Sample Size of One in Business Process Improvement
Do You Know These Dirty Secrets of Effective Communication? »

Comments

  1. Shay Maha says

    January 26, 2022 at 12:38 AM

    Project failures should be avoided at all costs, thanks for providing so much insight on this post!

    Reply
  2. Gregory Hutchins says

    January 30, 2022 at 2:02 PM

    The lens or prism for all problem solving and decision making is now through risk.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy