Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Are Prototypes Useful for Reliability Estimates

by Fred Schenkelberg Leave a Comment

Are Prototypes Useful for Reliability Estimates

Are Prototypes Useful for Reliability Estimates

Prototypes are precious items. A vendor sample or beta version of factory parts may provide necessary insights.

They are not real though.

The prototypes and samples we hold, admire, examine and test are just a representation of the final product or system.

It is extremely rare we will learn exactly what we need to know with these few items.

The problem with prototypes

Beyond scarcity, prototypes are a faint realization of the final product.

We may be pending component selection, vetted software, and assembly decisions.

The aim of the prototype is to learn as much as we can before finishing the design and assembly process development.

Each prototype is a start of measurements and experiments in order to make decisions and changes.

We often want to know how the product will perform for customers. On a shifting platform, it is difficult to get a clear view of the future.

Each prototype is a start of measurements and experiments in order to make decisions and changes.

One factor that impacts field reliability that is missing in prototypes is the variability of components, parts, assembly practices, and use conditions.

Keep in mind that the future performance is less promising than the prototypes may reveal.

Prototypes are still useful when treated appropriately

Learning about reliability performance when given prototypes is possible.

You have to start well before the first samples arrive.

A focus on reliability, early and often in the design process, determines the areas of reliability risk.

This allows you to either learn more about that specific risk. How it will manifest and how often it may occur.

Knowing these elements then permits sorting out how long before the failures occur.

Prototypes are informative.

If and only if you ask the right questions and prepare to find those answers.

Prototypes provide surprises

When dealing with prototypes it is too easy to dismiss failures are being due to the failure occurring on a prototype.

Doing so, you miss an opportunity to learn something about your design and assembly process.

Every failure is gold.

Avoiding the work to determine the root cause of a failure with a wave of your hand assuming it was due to a prototype only issue, has led to way too many field issues.

If something unexpected occurs with a prototype, that is worth taking the time to examine and understand.

Sure, some failures may be due to the substitute material, alternate assembly process, or lack of the final version of the software.

Sometimes it is the only time you will witness a 10% field failure issue during the development process.

You don’t know if the failure is major or not till you understand what caused the failure.

Reliability estimates based on prototypes

Running a test, any test to examine reliability performance has a couple of barriers to creating an accurate reliability estimate.

  • First, we’re using prototypes which may not fully represent the final product.
  • Second, the interpretation of the test conditions to use conditions may have limiting assumptions.
  • Third, sampling error – we get a particularly good or poor batch of prototypes.
  • Fourth, we excuse failures on ‘it’s a proto’
  • Fifth, it’s an extrapolation of data to the future, thus making the assumption the same pattern of reliability performance will continue
  • Sixth, the stresses applied to the prototype will excite the failure mechanisms we will eventually see in the field.

And more, you get the idea. Making reliability estimates is tricky business.

Understand the risks, develop models and expectations, evaluate and experiment to find failures, understand all failures, test and measure time to failure, and finally, expect your results will be wrong.

Monitor field performance and look to be surprised.

The fewer surprises from field failures, the better you did during the development process.

The more surprises, well you may have another chance.

How well have your reliability estimates compared to actual field performance?

What has worked or not worked for you?

Leave a comment below and join the conversation.

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Entropy and Maintenance
The Side Swipe: When Innovation is your Wheelhouse »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy