Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Project Manager Lessons Learned: Bad Technical Decision

by Greg Hutchins Leave a Comment

Project Manager Lessons Learned: Bad Technical Decision

Project Manager Lessons Learned: Bad Technical Decision

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

This story is an example of centering your design around a high-tech solution to a problem when a low risk proven technology would have more than sufficed.   Technical expertise egos got in the way of a practical low-cost approach resulting in unplanned schedule and cost growth.

Background

A defense company won a competitive contract to design, build, and deliver an expendable acoustic target for training sonar personnel at sea. It was common to use actual submarines for the training, but they were expensive and difficult to schedule frequently enough to be effective for the training program.  Hence the need for the expendable target. Expendable implies low cost and low risk but, in this case, to gain additional performance capability a bad decision (as was evident in hind sight) was made to use Lithium Thionyl Chloride batteries in lieu of the Alkaline batteries. Lithium batteries had several advantages: double the energy density of Alkaline batteries; long storage life; flat discharge rate preferred to achieve constant target speed; and wide operating temperature range. As was found out later, they also had several disadvantages: high cost; must have DOT (Department of Transportation) approval to ship; and can be dangerous as they have been known to explode under certain circumstances. However, the die was cast at the beginning of the program when the decision was made to go with high performance batteries.

The Training Target

In operation, the target was deployed from the deck of the ship. As it sunk, it moved in a spiral direction. When it reached a predetermined pressure, a pressure switch was activated and turned the motor on causing the target to move upward towards the surface along the azimuth angle it was at when the motor turned on. When the target reached a certain depth near the surface of the water, the other pressure switch actuated and stopped the motor and the target spiraled down. This cycle repeated itself until the training exercise was over or the battery ran out. As a result of the way the target operated, it represented a random walk (not a predetermined course) that allowed sonar personnel to track the target and sharpen their acoustic tracking skills. The target design was not complicated, and the performance requirements were very achievable. 

First Article Safety Tests

The design and build phase went well. A small number of targets (called First Article units), were built for functional and safety testing.  A good ground rule to remember is, be prepared for failure for any test conducted because there was always a risk of failure. The functional tests went well but the safety tests did not. The safety tests were conducted at a government test facility.  This test site specialized in explosives and since the target contained potentially explosive Lithium batteries, they had to undergo and pass several tests.  The most difficult test comprised heating the target to high temperatures (in a bunker) and deliberately causing the Lithium batteries to explode, which they did.  The target had to vent the instant high-volume gases to prevent flying debris caused by the explosion. To achieve this goal, the target vents had to be large and high in number. Unfortunately, the target failed the first test and later (after modifications) failed the second test.  The question was: How do we resolve this issue?

Compressor/Turbine Scenario 3 Risk

It was clear the Lithium batteries were a bad choice.  A decision was made to replace the Lithium batteries with the Alkaline type even though there would be a significant schedule and cost impact for the project. Fortunately, the contract included a large production order with several options that allowed project recovery over time.  The loss in performance by replacing the Lithium batteries turned out to be a non-problem because there was enough power to meet all the contract requirements. The project continued to perform to plan with the Alkaline batteries. It turned out to be a very successful project for the company.

Lessons Learned

  1. Do not assume greater risk than necessary to meet the contractual requirements with reasonable margins.
  2. Do not take on unproven, immature, or potential safety risk technology, components or features in your design. If required to do so, include budget and schedule time in the project baseline to adequately research and test these items beforehand.
  3. Do not let your lead technical person drive the program. Technical folks focus on functionality. How can I make it more functional? Project Manager (PM) focus on cost, schedule and meeting contract commitments. In the story above,  the PM was swayed by the technical lead to use Lithium batteries when he/she was unsure about it. Lesson learned: in the future, do not be swayed by a technical lead in the future unless if you are comfortable with it.
  4. Always perform a risk/benefit analysis for a new approach or major design change. It was not done in the above story. If it was, the Lithium batteries would not have been used because the risks outweighed the benefits.

SUMMARY

Good judgment comes from bad judgment. This story is a case in point for this message.

The PM is responsible for final decisions. In this story, the PM made a bad decision because he/she relied too much on the lead engineer. A risk assessment should also should have been conducted but it was not. The project suffered a cost and schedule impact as a result. Fortunately for the PM there was sufficient schedule and budget margin to recover.

Bio:

Currently John is an author, writer and consultant. He authored a book entitled Project Risk Management. It went on sale on Amazon in August 2019. He authored a second book titled How to Get a Project Management Job: Future of Work.  It is on sale on Amazon. The first book is a text book that includes all of the technical information you will need to become a PM. The second book shows you how to get a PM job. Between the two, you have the secret sauce to succeed. There are links to both books on his website.

He has presented numerous Webinars on project risk management to PMI. He writes columns on project risk management for CERM (certified enterprise risk management). John also writes blogs for APM (association for project management) in the UK. He has conducted a podcast on project risk management.  John has published numerous papers on project risk management and project management on LinkedIn.

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has extensive experience with commercial and DOD companies. He is a member of PMI (Project Management Institute). John has managed numerous large high technical development programs worth in excessive of $100M. He has extensive subcontract management experience domestically and foreign.  John has held a number of positions over his career including: Director of Programs; Director of Operations; Program Manager; Project Engineer; Engineering Manager; and Design Engineer.  He has experience with: design; manufacturing; test; integration; subcontract management; contracts; project management; risk management; and quality control.  John is a certified six sigma specialist, and certified to level 2 EVM (earned value management). Go to his website to find links to his books on Amazon as well as numerous papers he has written. https://projectriskmanagement.info/

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Convert a Constant Failure Rate to Operating Hours
The Instantaneous Cost of Failure from Breakdowns »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy