Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Project Governance and Resource Management

by Robert Allen Leave a Comment

Project Governance and Resource Management

Project Governance and Resource Management

All projects or programs have a formal or informal resource management process, with the goal of completing projects on time, within budget and with good project quality.

In order to meet this goal, the resource management objectives are:

  • the quantity of estimated resources is accurate
  • the resource role requirements are clear and precise
  • the resources meet or exceed the expectations (requirements)
  • the resources are added in a timely manner
  • cost of the resources is minimized to the extent possible

Detailed project plans directly align deliverables and activities with the appropriate resource roles needed, within the constraints of project scope and schedule.  As described in previous articles, a project phase and gate structure can help establish a high-level framework for identifying deliverables, activities and associated resources needs.  Alternatively, with agile/scrum, sprint planning and sprint retrospectives enable ongoing planning of scrum team resource needs.

Meanwhile, project sponsors can get visibility into resource needs across projects through a project governance process and tools (for example, enterprise project management software).

Governance means monitoring project quality and using the only levers project sponsors have available:

  • project cost (adding or subtracting resources)
  • scope (reducing or increasing scope)
  • schedule (reducing or allowing more time)

Let’s look at a project governance process, with an emphasis on resource management and staffing plans:

In this governance model, it can be seen the staffing needs come directly from those closest to the project…in this case, the core team leader (CTL) and project manager (PM).

This model would also work with an Agile/Scrum process….rather than a CTL/PM the Product Manager (PdM) and Scrum Master would collaborate to identify resources needs.

The primary responsibility falls upon the CTL or PdM, to (1) obtain the necessary resources from the functional manager(s) and (2) if the resources are unavailable, the steering committee can take action to provide additional resources or make project priority decisions.

Note the escalation path from CTL (or PdM) to functional manager.  Also, note the CTL (or PdM) would collaborate with the functional manager to escalate the mutually agreed resource constraint to the steering committee.

As mentioned previously, a project management operating system would enable analytics and decisions on which projects have the highest value, particularly across many projects and a wide variety of resource roles.

Key characteristics of the process are therefore (1) analytics, which identifies resource needs (2) prioritization across projects and (3) an escalation path to facilitate project prioritization or resource management decision-making.  (Downstream, of course, is the recruiting and human resources process…)

While there are several enterprise software tools that can help, a high-level process that aligns project governance with resource management would be a good place to start.

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: Product development

About Robert Allen

Robert Allen has over 25 years of professional experience in the areas of product development, process improvement and project management. Rob was a key contributor to numerous deployments of lean sigma and project management organizations, most notably with Honeywell and TE Connectivity. Included in Rob’s experience are multiple certifications and over 25 years of practice in the development, teaching, execution, and leadership of product lifecycle, lean product development, DFSS, lean six sigma, project management, systems engineering and supply chain.

« Holiday Detection in Above-ground Tank Bottom Lining Inspection
What Can You Do With Data? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Rob Allen
in the Product Development and Process Improvement series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Join PD&PI

[display_form id=369] Your email is safe and the opt-in here provides your permission to send messages concerning the PD&PI article list plus special announcements. Privacy Policy

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy