Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Product Reliability Participants – Part 2

by Fred Schenkelberg Leave a Comment

Product Reliability Participants – Part 2

Product Reliability Participants – Part 2

The last post in this series dealt with the design team, and the influence that team has on the product reliability process. This post will turn to product development and design managers, again looking at the role of that position in relation to product reliability. The series of posts on reliability participants will continue after today’s post with the roles of quality and reliability engineers and managers.

Why are design managers important?

Product development and design team managers provide the prioritization and resources that enable the design team to create a new product. A primary role related to reliability is the reinforcement of the importance of reliability by ensuring the use of suitable data and information for each decision under the full consideration of the influence various options have on the product’s reliability performance. For example, when considering two power supply options, the capabilities of the supplies such as weight, power output, and stability, along with cost, may dominate the decision of which option to incorporate into the design. The consideration of reliability here includes whether either or both options meet the reliability goal allocation.

Considering cost

Another consideration is the tradeoff between cost and expected cost of field failures. If one product has a markedly higher expected failure rate than another, it may cost more in warranty expenses and customer dissatisfaction than the other option. Many design managers encourage design tradeoff calculations related to performance, cost, and time to market. It is an additional duty to require full consideration of reliability for nearly all decisions made during development.

Consider the following example. In a product development team meeting, a design team manager listened to a report on an early reliability prediction of the design. It was broken down by the group, within the team: display, motherboard, power supply, etc. The first report indicated that the power supply was the weakest link or the most likely element to fail. So, at the design team manager asked the power supply team lead to do something about the low reliability and develop a plan to tackle the issue at the next week’s meeting.

Each week the team focused on the element that limited the product reliability as being the weakest link. The team considered tradeoffs between cost and reliability. The team made steady progress, and the leads learned to prepare a plan, in case the prediction tagged their area as the weakest link.

 

What’s the lesson?

The lesson here is that with a little reliability information and the simple question, “What are you going to do to improve your reliability?” the team’s focus on product reliability enhanced the design and its reliability performance.

 

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Roles & responsibilities

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Hypothesis Un-Equal Variance
Hypothesis Tests for Variance Case II »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy