Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Process Monitoring with Overall Equipment Effectiveness (OEE)

by Ray Harkins Leave a Comment

Process Monitoring with Overall Equipment Effectiveness (OEE)

Process Monitoring with Overall Equipment Effectiveness (OEE)

Aside from meeting specific quality system standard requirements—such as those found in ISO 9001 or IATF 16949—well-designed quality system metrics also can serve as meaningful indicators of the strengths and weaknesses of an organization’s various processes.

As a quality manager, I often consider how precisely our quality system objectives and other metrics describe the effectiveness of our systems. One metric I started using recently—overall equipment effectiveness (OEE)—has provided our management team with a composite measurable that encompasses three major branches of our operation: maintenance, production and quality.

Over the past three decades—during which standardized quality systems have taken a prominent role in manufacturing—certain metrics have risen to the top as the most common key indicators of performance in each of these three areas.

Consider this simple example to see how common key indicators work together to form OEE:

Machine availability is a common metric for measuring the effectiveness of an organization’s maintenance process. It’s calculated as the ratio of a machine’s actual run time to its scheduled run time. In some organizations, operator breaks and tardiness can reduce a machine’s run time, but unplanned outages because of maintenance problems always reduce availability.

If for instance, a machine was scheduled to run for eight hours during a given shift, but it actually ran for only 6.1 hours, this would yield an availability of:

(6.1 / 8.0) = 76.3%

For production, efficiency is a key metric calculated as a ratio of the number of parts produced in a certain amount of time to the maximum number of parts that could have been produced in the same amount of time.

If time studies demonstrate that a machine can produce 2,500 pieces per hour, but on a given day an operator produces 13,000 pieces in 6.1 hours of production, this operation ran an efficiency of:

(13,000 / 6.1) / 2,500 = 85.2%.

Quality is typically measured as a ratio of the number of good parts produced to the total number of parts produced. So, if only 12,770 of the 13,000 total parts produced meet the customer’s specifications, the measure of quality acceptance is:

(12,770 / 13,000) = 98.2%.

OEE is calculated as the product of these three metrics:

OEE = % Available x % Efficient x % Acceptable

So for our example, the OEE is:

OEE = 76.3% x 85.2% x 98.2 = 63.8%.

In his book, Overall Equipment Effectiveness, Robert Hansen details the OEE evaluation scale shown in Table 1. According to the scale, the OEE of this process is unacceptable.

pastedGraphic.png

OEE essentially is a measure of the total effectiveness of a manufacturing operation. When applied to the bottleneck operation in a process flow, OEE can provide a powerful indicator of the potential sales that are left on the table due to losses in the system. Business analysts refer to the sum of these losses as the effect of the hidden factory.

While the example given earlier uses OEE to measure the effectiveness of a shift, business professionals also can use OEE to compare part families, manufacturing facilities or other logical groupings. Developing and using metrics such as OEE that highlight an organization’s best opportunities for improvement have the potential to unlock the next level of profitability.

REFERENCE

1. Robert C. Hansen, Overall Equipment Effectiveness: A Powerful Production/ Maintenance Tool for Increased Profits, first edition, Industrial Press Inc., 2011.

[display_form id=362]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

About Ray Harkins

Ray Harkins is a senior manufacturing professional with over 25 years of experience in manufacturing engineering, quality management, and business analysis.

During his career, he has toured hundreds of manufacturing facilities and worked with leading industry professionals throughout North America and Japan.

« Hydroelectric Total Productive Maintenance and Preventative Maintenance
Unfit for Purpose – Part 2 – What Needs to be Fixed »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Logo for The Manufacturing Acadamey headshot of RayArticle by Ray Harkins
in the The Manufacturing Academy article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy