Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The Problems with Payback Period, Part 2

by Ray Harkins Leave a Comment

The Problems with Payback Period, Part 2

The Problems with Payback Period, Part 2

The problems with the payback period method as a means of analyzing and comparing potential investments extend beyond its problem with the time value of money. In fact, that problem can be corrected (but rarely is in practice) by using a method called the “Discounted Payback Period”, where the future expected cash flows are “discounted” to align them with the present value of the initial investment. But even with that correction, the Payback Period Method is still lacking as a primary return on investment (ROI) analysis tool.

If you missed part 1, check out “The Problems with Payback Period, Part 1”.

At the end of a ROI analysis using the payback period method, the project manager comes up with a time frame – such as 2.7 years – in which the initial investment will be paid back to the organization in the form of cost savings or increased net earnings. But the second major problem with this method is the question of what happens after the payback period (e.g. in years 3, 4 and 5).

Imagine two different cost saving projects that require identical initial investments and have identical payback periods. Are they equally valuable to the organization? How do you quantitatively decide between the two? Unfortunately, the payback period method is silent on these questions.

Two important inputs to a complete ROI analysis are the expected net earnings after the payback period, and the salvage value/costs of the equipment at the end of the project. Let consider a simple example to illustrate the effect of these critical inputs:

Table comparing two projects

Our two projects may be different automated inspection systems competing for the same budget dollars. Both require the same initial investment and the same estimated annual cost savings. As a result, they have same payback period.

The differences occur after the payback period. Project #1 has an expected life of 3 years, while project #2 has an expected life of 5 years.  Therefore, Project #2 will continue to add value to the organization in years 4 and 5 while the value contribution of Project #1 ends shortly after the payback period. In this light, Project # 2 is the better of the two.

A second factor that influences the value contribution of a project to an organization after the payback period is its salvage value. This is the estimated value of an asset at the end of its useful life, in our examples, either 3 or 5 years.

When you’re considering a major investment like a new factory or major capital equipment, it feels a bit strange to then also consider how you’re going to get rid of this thing after the project ends. But the value of that asset at the end of the project is often a key input to a thorough ROI analysis.

In our example, the salvage value of project #1 is $70,000, only 30% less than its original purchase price. This is a significant input in our analysis. Project # 1 may involve the purchase of flexible automation, which may still have a very high value to the organization after 3 years. Equipment like this can often be re-purposed within the organization and substantially offset the initial investment for the next capital purchase.

In project #2, the salvage value is -$30,000. Some dedicated equipment for instance tends to have little value after its project ends. With no market value as a piece of equipment, its sole value may come from selling it for scrap. But the salvage value of an asset also includes its de-installation cost. Some machines are heavy and require cranes and riggers to remove it. Some machines also require specialized foundations that need filling in. De-installation costs like these need to be factored in and can lead to a negative salvage value.

So in comparing our examples, the salvage value is a big plus for Project #1, but a significant negative for Project #2.

How then should you compare projects competing for the same budget dollars? The answer is simple: By calculating their financial contribution to the organization, over the entire life of the project, in “present-day” dollars. In the next article, we’ll examine a method for doing this called the “Net Present Value”.

For a deeper dive into capital equipment justification, and to learn the essentials of business finance all managers need, sign up today for Return on Investment (ROI) Analysis for Manufacturing.

[display_form id=362]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

About Ray Harkins

Ray Harkins is a senior manufacturing professional with over 25 years of experience in manufacturing engineering, quality management, and business analysis.

During his career, he has toured hundreds of manufacturing facilities and worked with leading industry professionals throughout North America and Japan.

« What IS Reliability? It has everything to do with what you NEED!
Choosing the Delivery Method for a Construction Project Can Be Risky »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Logo for The Manufacturing Acadamey headshot of RayArticle by Ray Harkins
in the The Manufacturing Academy article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy