Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Point and Interval Estimates

by Fred Schenkelberg 2 Comments

Point and Interval Estimates

Point and Interval Estimates

A point estimate of the mean of a population is determined by calculating the mean of a sample drawn from the population. The calculation of the mean is the sum of all sample values divided by the number of values.

$$ \large\displaystyle \bar{X}=\frac{\sum\nolimits_{i=1}^{n}{{{x}_{i}}}}{n}$$

Where $- \bar{X} -$ is the mean of the n individual xi values.

The larger the sample the more accurate the estimate. If n equals the number of items in the population the same formula calculates the population mean, $- \mu -$.

Estimate of location of $- \mu -$

The same of n items also can provide an interval that indicates where the population mean, $- \mu -$, resides with a stated probability or confidence. If we say the unknown population mean has a 90% chance of residing within an interval, we are using a 90% confidence interval. This also means there is a 10% chance $- \mu -$ falls outside the interval.

The formula for the confidence interval about an estimated mean is dependent on whether or not we know the population standard deviation, $- \sigma -$. Generally we do not know $- \sigma -$ and use an estimated standard deviation, s, using the sample values. The sample’s mean confidence interval is

$$ \large\displaystyle \bar{X}\pm {{t}_{\alpha /2,\text{ }n-1}}\frac{s}{\sqrt{n}}$$

Where $- {{t}_{\alpha /2,\text{ }n-1}} -$ is the t-distribution with 1-$- \alpha -$ confidence and n-1 degrees of freedom value. s is the sample standard deviation and n is the number of values in the sample.

If we know the population standard deviation, $- \sigma -$, then we can use the normal distribution instead of the t-distribution and the known $- \sigma -$ value instead of the estimate s.

I have long wondered that if we know the population standard deviation we probably also know the population mean and why would we be calculating a confidence interval. Not sure of a situation where I would use the known standard deviation, if you know of a situation, do let me know.

The formula for the confidence interval about a sample mean with a known population standard deviation is

$$ \large\displaystyle \bar{X}\pm {{Z}_{\alpha /2}}\frac{\sigma }{\sqrt{n}}$$

Where $- {{Z}_{\alpha /2}} -$ is the number of standard deviations from the center to the point when the area under the standard normal equals the $- 1-{\alpha }/{2}\; -$ percentile.

Example

Let say we have four readings of tensile strength of new polymer blend based on polypropylene, 32.3, 34.7, 32,6, and 33.5 MPa. Determine the estimate of the population mean and a 95% confidence interval about the point estimate.

The mean of the four values is 33.275 Mpa. This is the point estimate of the mean.

The sample standard deviation, s, is 1.08 MPa, which we will need for the confidence interval calculation.

$$ \large\displaystyle \bar{X}\pm {{t}_{\alpha /2,\text{ }n-1}}\frac{s}{\sqrt{n}}=33.275\pm 3.182\left( \frac{1.08}{2} \right)=31.56\text{ and }34.99$$

The critical value is from the t-distribution table with n-1 = 3 degrees of freedom, and $- \alpha -$ = 0.05 / 2 = 0.025 Practice problems like this using the same calculator and references you expect to use during the exam.


Related:

Statistical Confidence (article)

Reliability with confidence (article)

Tolerance Intervals for Normal Distribution Based Set of Data (article)

 

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Confidence interval or bound

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Reliability Questions to Ask During a Review
How to Be Deliberately Proactive »

Comments

  1. Sunday clifort says

    December 17, 2022 at 7:14 PM

    Why did you not show your working step after the other

    Reply
    • Fred Schenkelberg says

      December 18, 2022 at 7:04 AM

      Hi Sunday, not sure I understand the comment. cheers, Fred

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy