Accendo Reliability https://fred-schenkelberg-project.prev01.rmkr.net Sat, 11 Nov 2023 00:03:56 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.2 © 2025 FMS Reliability Illuminated Reliability Engineering Knowledge Accendo Reliability Illuminated Reliability Engineering Knowledge Accendo Reliability fms@fmsreliability.com No SOR 919 Details and Plans https://fred-schenkelberg-project.prev01.rmkr.net/podcast/sor/sor-919-details-and-plans/ https://fred-schenkelberg-project.prev01.rmkr.net/podcast/sor/sor-919-details-and-plans/#respond Mon, 04 Dec 2023 11:22:16 +0000 https://accendoreliability.com/?post_type=podcast&p=531640 Details and Plans

Abstract

Greg and Fred discuss why and how the triple constraints of a project: schedule, cost, and scope variances result in risks that can result in project failure.

Key Points

Join Greg and Fred as they discuss schedule risk, cost risk, and scope risk.  Topics include:

  • What are schedule, cost, and scope risks?
  • How do you measure each?
  • How can each contribute to project failure?
  • How can you manage and mitigate these risks?

Enjoy an episode of Speaking of Reliability. Where you can join friends as they discuss reliability topics. Join us as we discuss topics ranging from design for reliability techniques to field data analysis approaches.



Show Notes

 

]]>
https://fred-schenkelberg-project.prev01.rmkr.net/podcast/sor/sor-919-details-and-plans/feed/ 0
Notice: Undefined offset: 2 in /var/www/fred-schenkelberg-project.prev01.rmkr.net/wp-includes/feed.php on line 486

Notice: Undefined offset: 1 in /var/www/fred-schenkelberg-project.prev01.rmkr.net/wp-includes/feed.php on line 496