Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Planning for Profitability

by James Kovacevic Leave a Comment

Planning for Profitability

Man working at desk
Photo from Seattle Municipal Archives

How Maintenance Planning & Scheduling Can Improve Your Profitability

What if you could improve your maintenance department to the point where you increase the efficiency and the amount of work completed of your department by 80%? Would this be something that interests you?

A properly setup and managed Maintenance Planning & Scheduling Program can enable that type of success and enable your operation to plan for profitability.

This type of increase in efficiency may seem farfetched, but it can be achieved. The typical maintenance department operates between an efficiency of 30-35%, with best in class departments operating at 55% or better. What separates these operations? Planning & Scheduling!

I remember when I first heard about maintenance planning & scheduling.

I was a new maintenance supervisor and was trying to figure out why our PM routines were not being completed on time and what we could do about it.   I ask my team what was causing the issues and I heard them loud and clear. “No Parts. Production won’t give us the equipment. I need help with that. I don’t know what the PM routine wants me to do.”

During that time the CMMS would print out the PMs Monday morning, and we had to execute them. There were no parts listed, poor task descriptions, and there was no discussion with operations on schedule.   We were not in a good place.

After some initial internet research, I came across some basic information on Maintenance Planning & Scheduling. It seemed to answer all of my questions, but I had to learn more. I found Doc Palmer’s Maintenance Planning and Scheduling Handbook, and became a true believer and have been a large and focal proponent since. Over the next five posts, I will provide an explanation of Maintenance Planning & Scheduling, what works, what doesn’t, and how to measure your success.

So what is Maintenance Planning and Scheduling?

Planning:

Maintenance Planning Is The Act Of Ensuring A Job Is Completed Right the First Time.

  • Identifies the What, Why & How
  • Identifies Barriers and Reduces Barriers to Ensure the Efficient Completion of Work
  • Is a Knowledge Management System

 

Scheduling:

Maintenance Scheduling is the act of Maximizing utilization of resources.

 

  • Identifies Who, Where, When
  • Ensure the Right People, and the Right Materials are in the Right Place
  • Ensures Coordination with Operations

 

Sounds simple enough, but in order to be successful in Maintenance Planning & Scheduling, you must have the foundations in place. The foundations in Maintenance Planning & Scheduling are all about enabling a systematic process, and ensuring that the proper information is available to facilitate Planning & Scheduling.

A typical Maintenance Planning and Scheduling program would have to have the following elements in place:

Equipment & Associated Data is used to identify and group, like equipment. It also contains specifics about the equipment, including its performance, specification, and operating context.

Work Types is used to identify the type of work being completing. This is used for reporting, scheduling and to evaluate the effectiveness of the overall maintenance and reliability program. The number of categories can vary from a few to several, depending on the needs of the organization.

Work Order Status is used to track the work order through the process and communicate status. This ensures that everyone can identify where the work order is in the work order process.

Work Priorities are used to establish planning priorities, scheduling horizons, in addition to establishing expectations with operations. Typically the priorities will be identified with a timeline, such as, <30 days.

Technical Information & Supporting Documents facilitate the planning process and the work in progress. It serves to reduce the amount of time spent planning. Included in this library of information are manuals, bill of materials, and drawings.

Feedback and Failure Reporting ensures the right information is recorded to analyze and improve the equipment and the work. This feedback is typically provided using predefined codes.

Based on the foundations mentioned, do you have what it takes to make your Maintenance Planning & Scheduling program successful? Where are your gaps?

Remember, to find success, you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
HP RELIABILITY
Solve, Achieve, Sustain


Disclosure of Material Connection: Some of the links in the post above are “affiliate links.” This means if you click on the link and purchase the item, I will receive an affiliate commission. Regardless, I only recommend products or services I use personally and believe will add value to my readers. I am disclosing this accordance with the Federal Trade Commission’s 16 CFR, Part 255: “Guides Concerning the Use of Endorsements and Testimonials in Advertising.”

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Maintenance planning, Maintenance scheduling

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Cost Control or Value Generation?
The Top 5 Signs of a Reliable Plant »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy