Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Are You Planning Ahead?

by Robert Kalwarowsky Leave a Comment

Are You Planning Ahead?

Are You Planning Ahead?
My parents are going through a big renovation on their home and, when I was speaking to my Mom, she said 2 very insightful things.

  • “Your Dad is upset that we have to spend all this money on the renovation”
  • “If we would have done small improvements a few times, we wouldn’t have had to spend all this money at once.”

Sound familiar?  Throughout my career, I’ve seen many companies tackle this same problem.  Often, when starting a plant/pipeline/mine/etc., we buy all the equipment and we flip the “On” switch at the same time.  This creates groups of equipment that will all need to be replaced around the same time.

Management doesn’t like huge spikes in capital expenses.

Generally, management won’t allow for massive spikes in capital expenses because of budgetary constraints or impact on the stock price.  That means, you’ll be stuck with equipment that’s in poor condition.

What should you do?

If you haven’t yet, start nailing down these groups of equipment.  Start thinking about the next 5-10 years.  Start understanding when equipment will be aging out and plan for that eventuality.  If you can, spread those replacements over multiple years to minimize the spike.  That will be more palatable for your management team.  Reliability is about the future, not the now.

Reliability Never Sleeps,Rob

Filed Under: Articles, on Maintenance Reliability, Rob's Reliability Project

About Robert Kalwarowsky

Robert Kalwarowsky joined Fluid Life in the spring of 2014 and currently focuses on machine learning, lubrication & reliability audits and reliability product development. Previously, Rob worked as a Reliability Engineer at Teck Resources and his work focused on condition-based monitoring analytics, failure prediction, risk analysis and spare parts optimization. He also has consulting experience in financial modeling with an emphasis on optimization and cost benefit analysis. Prior to that, Rob graduated from the Massachusetts Institute of Technology (MIT) with a Bachelor of Science degree in Mechanical Engineering with a minor in Management.

« Reliability Testing on OEM Systems
Importance of Maintenance Planning and Scheduling »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Robert Kalwarowsky
in the Rob's Reliability Project Article Series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy