Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Panning for Gold: Analyzing Chronic Failures

by Robert (Bob) J. Latino Leave a Comment

Panning for Gold: Analyzing Chronic Failures

Panning for Gold: Analyzing Chronic Failures

The majority of times that a Root Cause Analysis (RCA) is ‘required’ is often due to some type of threshold of pain being met. Someone is hurt, we’ve had an environmental excursion, we lost a lot of money in throughput or equipment damage, we violated some regulation, etc. Essentially, when the ‘suits’ show up, something bad has happened and we will do an RCA whether we like it or not. This is the basis of ‘reactive RCA’, where we respond to an incident that has already met certain defined requirements, often called ‘triggers’.

What about the chronic failures that happen each shift and become a cost of doing business, but do not meet the trigger requirements? We know which ones these are because they are no longer a failure, they are part of the job. These are rarely found in our recording systems because they happen so often and are so easily fixed (to get back to where we were), they are hidden in plain sight.

Knowledge of these chronic failures are in the heads of our front-line warriors. It often takes too much time to input such occurrences into the CMMS system, so it is not worth my time. These are the gold nuggets that need to be mined, and are often the ones that produce much greater ROI’s than the more sporadic type of events. On their individual occurrence, these chronic failures are viewed as insignificant. However, if we stepped back over a year’s time and looked at their cost/occurrence (labor, materials and downtime alone), they would far outweigh the annual costs of the more sporadic types of failures….hands down!

Those closest to the work, know what I mean. They get tired of fixing the same thing, over and over again. But their efforts/suggestions to formally resolve the chronic failures fall upon deaf ears, often because production rules. We then take on the paradigm that ‘We NEVER seem to have the time and budget to do things right, but we ALWAYS seem to have the time and budget to do them again”! More simply put, ‘If you (a.k.a. – mgmt) don’t care, neither do I’.

How does one make the business case for proving to the ‘suits’ that these chronic types of failures are eating our lunch? The attached article, Getting to the Root of Chronic Failures, will explain in detail how to make such a case, but let’s look at a ‘teaser’ scenario.

Take any repetitive task (no matter where you work), for example ‘delays at job site due to wrong/incorrect parts staged’, and do the following calculation (Frequency x Sum of Impacts [Labor $, Materials $, Downtime $]):

For the sake of example, we will assume there is a 1 hour delay on the project until we are able to get the right parts and proceed with the planned job. Let’s say this happens 1/day somewhere on our site.

Every time this delay occurs, we waste an hour of each craft assigned to the project, as well as storeroom personnel and the parts runners. We will be conservative on their hourly rates and say aggregated, they total $150/occurrence.

We will throw in a low estimate of $50 for parts having to be restocked or thrown away.

We will continue with our conservative assumptions and say that a lost downtime hour on the operation will be $5,000/occurrence (lost profit opportunity).

365 Occurrences/yr x ($150 (Labor) + $50 (Materials) + $5000 (Production))

The total annual loss of this chronic failure would be in excess of $1.8M USD.

This type of failure is not likely to be found as a line item in most any CMMS system, any Balance Sheet or Income Statement…it is just a golden nugget!

How many ‘golden nuggets’ do you know about in your work environment? What would you estimate they cost your organization per year (that they will never know about unless they ask you!)?

Filed Under: Articles, on Maintenance Reliability, The RCA

About Robert (Bob) J. Latino

Robert Latino is currently a Principal at Prelical Solutions, LLC, along with his brother Ken Latino. Bob was a Founder and CEO of Reliability Center, Inc. (RCI), until it was acquired in 2019. RCI is a 50-year-old Reliability Consulting firm specializing in improving Equipment, Process and Human Reliability. Mr. Latino received his Bachelor’s degree in Business Administration and Management from Virginia Commonwealth University. For any questions, please contact Bob at blatino@prelical.com

« You Can’t ‘Contract’ your Way to Reliability
A Story About Plus One »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

logo for The RCA article series image of BobArticle by Robert (Bob) J. Latino
Principal at Prelical Solutions, LLC

in the The RCA article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy