Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The P-F Curve Revisited

by James Kovacevic Leave a Comment

The P-F Curve Revisited

Understanding The Importance of Proper Equipment Installation

There has been much discussion (and often debate) around the P-F curve.  The P-F curve illustrates the relationship between the warning signs that are detectable by various technology or methods and the progression of the failure.   What is often not discussed and overlooked, is what happens before the equipment starts to deteriorate.

If the ultimate goal of an organization is to be proactive and ensure equipment uptime, wouldn’t the organization want to prevent the equipment from failing in the first place and not catch it after it has already started to fail?

Proper equipment installation is absolutely critical to ensuring the long-term, problem-free operation of an asset.  Proper installation is much higher up on the P-F curve, where the curve is still flat before a defect occurs.  By focusing on this flat section of the P-F curve, any organization can be proactive from the very beginning.

How To Ensure Proper Equipment Installation

So how does an organization ensure proper installation?  There is a methodology that is to ensure proper equipment installation and prevent defects from occurring.

  • Establish standards for equipment installation.  These standards set forth all of the requirements for equipment and components installation.  These standards are broken down by component, include the how, as well as the specification which must be achieved.
  • Have equipment installed to the standard.  The standards must be communicated with procurement, engineering, and maintenance.  The standards must provide as part of the contract if using external staff.  This will ensure that the manufacturers of the equipment will build and install the equipment to the standard.  The internal team needs to be trained on the standards as well.
  • Validate that the standards have been met.  Providing the standards to the manufacturer or installer is not enough.  The installation needs to be validated that the standards have been achieved.  This could be done by having the installer document all activities and performing physical spot checks to ensure that the documents match what is found.
  • Check that the standards are still achieved.  Three to six months after the equipment is installed, go back and validate that all of the components installed are still within the acceptable standard.  This will ensure that after the break-in period that the equipment/components have not drifted out of standard and potentially lead to defects.

This approach needs to be documented in the various process(es), policies and procedures used by the organization for CAPEX, Procurement, and Maintenance.

What Standards Are Required?

With the methodology defined, standards need to be defined for each type of equipment or component.  A generic standard that states “All equipment/components will be installed to manufacturer recommendations or known best practices.” is not acceptable.  These standards need to be detailed and take into account all of the various sizes and usage of the equipment/component.  Listed below are some of the common installation standards that should be included in any program;

  • Foundation – How large should the foundation be?  What should the foundation be made of?
  • Alignment – Have all couplings been aligned to acceptable offset and angular tolerances?  Are the tolerances based on the RPM of the coupling… they should be.
  • Balancing – At what speeds should the rotor be balanced at?  Will it be balanced on a single plane or multiplane? What ISO grade is required for the various levels of equipment criticality?
  • Vibration – What level of vibration is acceptable and where on the equipment is it acceptable, if at all?
  • Anchoring – What size and type of anchors bolts are acceptable.  Will J-Bolts be used, wedge type anchors, threaded rod with epoxy or chemical anchors?
  • Isolation – Will isolation be achieved by separating the foundation from the surrounding floor?  Or will springs and elastomeric pads be used?
  • Level – Is liquid level enough, or should a laser system be used to ensure a true horizontal plane?
  • Bearings – All bearing should be installed using an immersion heater and oil bath.

This is just a sample of a few of the standards that may be required.  All of the standards need to be detailed in their expectations and final outcomes.   As always, choose and develop the standards that make sense for your organization.   Not all organizations may require standards for everything, so be pragmatic about it.

Equipment installation is no longer a simple activity that just involves tightening bolts before start-up.  There are many standards (ASTM, ANSI, ASME, etc.)  that provide best practices for all aspect.  The question is, is your equipment installation adequate to prevent failures in the first place?

Remember, to find success; you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
Eruditio, LLC
Where Education Meets Application
Follow @EruditioLLC

References:

  • ANSI Standards
  • Making Common Sense Common Practice

 

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: P-F curve

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« KISS: A Principle for Proper Project Planning
Membrane and Leaf Filtration Overview »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy