Today we are going to look at Design Rates. Often times our equipment are not running at their designed rate. Most of which are operational issues. For example, we tend to slow down a line, to present less problems, but it lowers the target rate. How do we identify an actual opportunity?
About George Williams
George has a MS in Reliability Engineering from Monash University, is a CMRP, and CRL. George has over 25 years of experience in the Life Sciences industry and food manufacturing. He is a CRL, CMRP, a Black Belt in Reliability, Uptime Award Winner and a CMRP of the Year recipient. He is a well recognized thought leader, change agent, speaker and teacher within the industry. He also teaches courses in Maintenance Management and Planning & Scheduling at the University of Wisconsin.
Leave a Reply