Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / One of the Biggest RCM Misconceptions

by Nancy Regan 1 Comment

One of the Biggest RCM Misconceptions

One of the Biggest RCM Misconceptions

You must have comprehensive “historical data” in order to carry out Reliability Centered Maintenance (RCM) (misconception)

Historical data is important for a Reliability Centered Maintenance (RCM) analysis. But the kind of data that is generally collected isn’t sufficient to answer all the questions in the RCM process – and thereby formulate specific solutions.

Let me show you what I mean.

The kind of data collected for assets can be likened to baseball statistics. (I can’t help it. As a native Bostonian, I was brought up by fanatical Red Sox fans!)

Player Smith’s batting average is .204 which means the batter gets a hit approximately twice out of every ten at-bats. He has 21 runs batted in (RBI) and six home runs. A batting coach can review this data and conclude that batter Smith needs improvement.

This is valuable information because now the batting coach knows where resources need to be designated (i.e. helping batter Smith to improve his performance).

However, what the batting coach cannot deduce from the data is what is “causing” batter Smith to perform poorly (think Failure Modes…). So, the coach cannot formulate specificsolutions to help the batter improve based on the data alone.

For example, should the batter start to swing a little earlier? Or maybe a little later? Or maybe the batter needs to change his stance? Those questions can’t be answered solely by evaluating the data.

Historical data for assets is often of the same ilk. For example, a review of bearing data can reveal that 50 bearings were replaced last year (up from 20 last year). From this, the equipment custodian can conclude that there is a problem regarding the bearing.

However, what specifically caused the bearing failures cannot be identified simply from reviewing the data at hand.

For example, were the bearings greased improperly? Were they not greased at all? Was the wrong grease used? Was there a manufacturing defect? Were the bearings fitted improperly?

There are many issues that could specifically cause the bearing failures.

So, while the data is valuable because it allows an equipment custodian to zero in on problem areas and thereby allocate resources where they can be of most benefit, the data doesn’t reveal exactly what is causing the bearing problem.

Generally speaking, historical data often falls short because it typically:

  • Reports only what failed
  • Describes what was done to repair the failure rather than what caused it
  • Doesn’t describe failures that are currently being prevented or plausible failures that haven’t occurred
  • Describes failures which may be the effect of some other failure
  • Offers inadequate information for determining On-Condition, Restoration, and Replacement task intervals

You may be wondering, well then, where do we go from here? If historical data is often inadequate to perform an RCM analysis, where can an organization turn to get the information?

(Don’t worry. RCM’s got you covered.)

(If you’d like to learn more about Reliability Centered Maintenance, click here.)

Organizations can capture an enormous amount of information by asking the right people – those who are most intimate with and knowledgeable of the asset and the operating environment in which the asset is expected to operate. This is one of the most valuable tools in any RCM analysis.

These equipment experts make up the RCM Working Group and represent the various disciplines applicable to the analysis at hand.

The figure below depicts an RCM Working Group assembled to analyze a boiler

When an RCM Working Group is assembled, there are typically over 100 years of cumulative experience at an organization’s disposal!

Because of the vast and varied experience and perspectives represented, it is a unique opportunity to “acquire” the kind of data needed to formulate solutions that can make a remarkable difference to the organization.

By turning to people who know where the improvement opportunities are, a skilled Facilitator can use RCM principles to consolidate their knowledge and lead the experts in formulating solutions that can have a powerful impact on the organization.

Thank you for taking the time to read my article! ~Nancy

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

About Nancy Regan

Nancy Regan is a leading authority on Reliability Centered Maintenance (RCM).   She has over 20 years’ experience of hands-on practice facilitating RCM analyses, conducting RCM training, and assisting her clients in implementing RCM programs.  With RCM, she helps organizations achieve goals such as reducing maintenance costs, identifying the cause of chronic failure, and shifting from a reactive to a proactive maintenance environment.  Nancy also helps people overcome the organizational challenges that are in the way of creating an effective Reliability Culture.

« Green Safety: Manage Risks Arising From Green Technologies
Transient Markov Model of Multiple Failure Modes »

Comments

  1. Larry George says

    September 11, 2022 at 9:55 PM

    You’re welcome. You’re right. Field data won’t identify root cause.
    Stay tuned for my next Weekly update article on “Failure Rate Classification for RCM.” I’m old; I still do it the way Nowland and Heap classified failure rate functions for UAL from ships and returns counts, if lifetime field data are not available. Condition monitoring tells me whether current conditions deviate from the estimated field failure rate classification, not root cause.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Nancy Regan
in the Everyday RCM series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy