Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Myth Busting 8: Who should schedule work

by James Reyes-Picknell Leave a Comment

Myth Busting 8: Who should schedule work

This myth is about who should schedule work.

There are three roles involved here: planners who plan the jobs, supervisors who supervise their crews and schedulers who create the work schedule.

Planning, as stated before, is all about what work gets done and how.

Scheduling is about when the work gets done. The practical constraint is that no work goes on a schedule until you are sure you have everything you need to execute that work when you schedule it.

It’s like baking in your kitchen. You wouldn’t start a cake or other baked good, without the ingredients being on hand unless you knew they were coming in on time before you need to use them. So, if the baking soda isn’t available you’ll make sure you get it before you start. If you don’t, then your baking will be stalled while you go get it. Maintenance is much the same. Don’t start until you have all that you need on hand.

Making sure all that is available isn’t planning. Planning actually tells you to want you will need – it’s sort of like writing the recipe. Planning is done by a planner. Scheduling is an activity in which we check on availability of resources before putting the job onto the works schedule for any given week. Scheduling is done by a scheduler or, in many organizations, by a planner. Regardless of who does it, planning and scheduling are two different activities.

Arguably the checking on resource availability (particularly for parts and materials) is neither planning nor scheduling. It is a resource marshalling or coordination role. Since most of the work is about making sure parts are available. Indeed, some organizations have a materials coordinator role that supports scheduling using the materials called for in the job plans that are created by planners. That materials coordinate can work for the materials/supply chain people or for maintenance – it really doesn’t matter, but the function is critical to scheduling.

OK – so planners can schedule work, but it doesn’t need to be them. Scheduling does not take the technical skills/knowledge that planning requires. It really only requires good organizational skills to produce a schedule. The nature of the work being done by the trades being assigned to the work is not really relevant to scheduling. However, the number of trades available with those skills as specified in the plan is needed.

Should a supervisor schedule? My answer is no, although it is a somewhat common practice.

Wherever I’ve seen supervisors doing the bulk of the work scheduling, they are doing it in response to the immediate priorities of the operational departments, which are usually driven more by emotion than accepted scheduling parameters of priority and criticality. They must, by the nature of their work, maintain good relationships with operational staff. It is quite natural for them to want to please their “customer” in operations. In doing so, they often bow to the wishes of the day, meaning (usually) whatever the operator says he needs. Operators are not usually worried about overall production goals, they are interested in what is happening on their shift. Anyone who has operated in a plant or factory or similar environments will attest to that. If something is going to go wrong, you don’t want it to happen “on my watch”.

Supervisors are too close to the day-to-day ups and downs of normal operations and dealing with the myriad of problems that invariably arise, to do a good job of scheduling. They tend to be very good at reacting and putting out the panic-du-jour, but not always so good at looking far ahead. Scheduling looks farther ahead and considers more factors than a supervisor will have top of mind. Scheduling should be done by the scheduler or planner who does scheduling taking into account priorities, criticalities, the availability of resources across the trade and plant, availability of materials for each job, willingness of operations to release equipment for work, etc. Doing that on the fly as supervisors will tend to do (most of the time) risks ignoring some critical factors and sub-optimizing the workforce deployment and overall effort to keep backlogs under control.

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Root Cause Analysis — What is 8D?
The Future of Quality in Business: A Continuation of the Dialog »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy