Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / MRO Technology — 1

by James Reyes-Picknell Leave a Comment

MRO Technology — 1

MRO Technology — 1

Here are a couple of curious observations:

  1. End users and providers of ERPs (enterprise management systems) are often technologically very backward in this specialty of managing MRO supplies.
  2. There are but a handful of specialists (experts) in this field who have developed any sort of advanced technological solutions, yet they remain somewhat obscure.

Whilst there is considerable knowledge and expertise available it does not seem to get far beyond those specialists.

Is There Complexity in the Management of MRO Materials?

Unfortunately, a reductionist and misguided view still prevails in industry, where everything boils down to manually assigning Min / Max to items in an inventory.

I could write dozens of pages explaining what is the real dimension and complexity of the discipline (risk analysis, economics, logistics, mathematics, statistics, reliability engineering, theory of constraints etc.). However, as there is no room for extended explanations, I will give this illustrative example:

Suppose an inventory of just 1,000 items (a thousand stock codes); even if we set a maximum stock level of 1 (allowing just 2 options between 0 and 1 for each item), there are 21,000 distinct inventory positions, i.e., an astronomical number of possibilities.

The question that then arises is: Among these possibilities, which one or ones would be the best? As it can be seen, a reasonable level of complexity exists and certainly cannot be approached without the support of advanced analytical tools that, despite being available in the marketplace for quite a long time, most industrial companies either still do not know or do not use.

What is the Real Impact of MRO Materials in the World Industry?

Many companies have too much of what they don’t need and not enough of what they do, inventory levels tend to be higher than necessary, resulting in financial loss with working capital tied up to inventory.

There is an inexorable fact: every lack of material (stock-out) causes some sort of an operating expense (production loss, product downgrade or loss, cost with operating and maintenance maneuvers to keep the plant running, expedited freight, overtime, and lower labor productivity, among others).

Moreover, an ineffective spares management process can result in at least 20% – 35% of machine down time due to its impact on repair times. This is often due to the lack of necessary parts and materials to perform repairs correctly and quickly the first time. The side effect is lower availability and, consequently, lower production volume, lower revenue and lower profit. Compounding that we can find maintainers who will “make due” with what’s available, corrupting asset configuration and potentially creating even more downtime when later incidents occur with the same machine.

Paradoxically, despite significant production losses caused by lack of spare parts, those losses are hardly accepted by management. Often we hear a claim: “Here in our company there is no production loss because any loss can always be recovered without impacting the production plan.”

Excluding spare capacity caused by lack of demand for the products, if there is always room to “recover production losses”, then one would conclude that the assets are being programmed to operate with float, and one of the reasons for this certainly is the assumed “unavoidable” delays caused by lack of materials. In other words, we assume there will be delays, build in slack to allow for it and then we can’t be behind! Prophesy becomes reality.

Part 2 will go over effective technologies to manage MRO Materials. Be sure to subscribe to our blog to receive an instant notification.


This article was written by David A de Castro, President of Brasman Engenharia, Brazil. He is a registered consulting engineer with an MSc degree in mechanical engineering. David has over 35 years of experience in maintenance and reliability engineering with large corporations and on-the-job training in Germany, Italy, Spain, Switzerland, the UK and USA. He has authored over than 20 technical papers on maintenance engineering and MRO materials. For the past 10 years, David has specialized in scientific inventory control of MRO materials and spare parts. The work has involved developing and implementing innovative best practices and analytical tools to process facilities all over Brazil. David is a lecturer of post-graduation at the University of Salvador, Unifacs, Salvador, Brazil.

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Artificial Intelligence: The Next Undiscovered Country
Why the Tie »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy